Title Page

  • Site conducted

  • Conducted on

  • Project Name

  • Location

SAFETY CHECKLIST

  • JHA must be filed out every day while onsite. Use the plus button to add multiple JHA's.

  • Daily Job Hazard Analysis (JHA)
  • Date:

  • Each present crew member to sign name and signature acknowledging attendance at this meeting

  • Crew Members
  • Name & Signature

  • List tasks for the day

  • List of potential hazards

  • Summary of Tool Box Talk

  • Daily safety pictures of whole crew wearing PPE during toolbox talk

  • Tools inspected and in proper working order?

  • Fall protection measures inspected and in place?

  • PPE inventory

  • First Aid Kit on-site?

  • Name of competent safety personnel (30HR OSHA Certified Safety required)

  • First aid personnel identified?

  • Who?

  • Nearest Medical Facility
  • GFCI used where required?

  • Water available on-site?

  • Lock-out Tag-out (LOTO) on hand?

  • Cell service available?

Site Details

  • Was the customer available for the initial walkaround before pounding posts?

  • Was the site flagged?

  • Was the trench flagged?

  • Wheeled distance by sales

  • Wheeled distance (meter to closest array post)

Material Onsite

  • Review the BOM on the binder and document the required material vs the material that has physically been delivered.

  • Which warehouse did the material come from? (Michigan or Illinois)

Modules

  • Quantity required per binder - Modules

  • Quantity delivered - Modules

  • Model number per binder - Modules

  • Model number of delivered - Modules (Take picture of label on module)

Posts

  • Quantity required per binder - 4 X 7 X 168" Posts

  • Quantity delivered - 4 X 7 X 168" Posts

  • Quantity required per binder - 4 X 9 X 174" Posts

  • Quantity delivered - 4 X 9 X 174" Posts

  • Quantity required per binder - 4 X 9 X 180" Posts

  • Quantity delivered - 4 X 9 X 180" Posts

  • Quantity required per binder - 4 X 9 X 198" Posts

  • Quantity delivered - 4 X 9 X 198" Posts

  • Quantity required per binder - 4 X 9 X 204" Posts

  • Quantity delivered - 4 X 9 X 204" Posts

Trusses

  • Quantity required per binder - 134" Truss

  • Quantity delivered - 134" Truss

  • Quantity required per binder - 140" Truss

  • Quantity delivered - 140" Truss

  • Quantity required per binder - 144" Truss

  • Quantity delivered - 144" Truss

Strut

  • Quantity required per binder - 40" Strut

  • Quantity delivered - 40" Strut

Purlins

  • Quantity required per binder - 214" Purlin

  • Quantity delivered - 214" Purlin

  • Quantity required per binder - 186" Purlin

  • Quantity delivered - 186" Purlin

  • Quantity required per binder - 170" Purlin

  • Quantity delivered - 170" Purlin

  • Quantity required per binder - 140" Purlin

  • Quantity delivered - 140" Purlin

  • Quantity required per binder - 128" Purlin

  • Quantity delivered - 128" Purlin

East/West Purlins

  • Quantity required per binder - 52" East Purlin

  • Quantity delivered - 52" East Purlin

  • Quantity required per binder - 52" West Purlin

  • Quantity delivered - 52" West Purlin

  • Quantity required per binder - 48.5" East Purlin

  • Quantity delivered - 48.5" East Purlin

  • Quantity required per binder - 48.5" West Purlin

  • Quantity delivered - 48.5" West Purlin

Hardware Kits

  • Quantity required per binder - Hardware Kits

  • Quantity delivered - Hardware Kits

  • Pictures of Post

  • Picture of post height sheet

  • Additional Comments

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.