Information
-
Audit Title
-
Enter client name
-
Enter project description
-
Enter project number
-
Enter site address
-
Prepared by
-
Enter date prepared
-
Is this an initial visit, or a follow up visit?
-
Please provide the date of the initial visit.
-
Is this a "New Construction" project, or a "Retrofit" project?
-
When does this project need to be complete?
-
Who is the onsite contact and what is their contact information?
-
Are we able to work during business hours? (8:00AM - 5:00PM)
-
Please enter what time(s) we able to complete the work above. (*NOTE* if hours worked are evening or weekend hours additional labor charges may apply)
-
Are we able to use a hammer drill or other loud tools during business hours?
-
Please enter what time(s) we are able to complete the work above. (*NOTE* if hours worked are evening or weekend hours additional labor charges may apply)
-
Do we have an accurate room Diagram?
-
Please use MagicPlan to create a room diagram and attach it as a PDF above.
-
Is there currently any AV installed in the room?
-
Are we re-using any of the current AV?
-
Do we have a current schematic?
-
Do we have a copy of the compiled code?
-
Are we able to re-use any of the current cable?
-
Are we pulling our own cable?
-
Please enter who is going to be pulling our cable above.
-
Do they have a current version of the pull schedule/drawings?
-
What material are the walls?
- Sheet Rock
- Sheet Rock w/ Wall Paper
- Plaster
- Cement
- Brick
- Wood
- Metal
- Other
-
Please enter what material the walls are.
-
Do we know what is behind this material?
-
Please do some research and find out what is behind material and enter the information above.
-
Please enter what is behind the material?
-
Is the client going to provide conduit for cabling?
-
Is the client aware we will be using Panduit?
-
What are is the ceiling treatment?
- Sheet Rock
- Plaster
- Cement
- Drop Ceiling
- Coffered
- Metal
- Other
-
Please enter what the ceiling treatment is.
-
Are you able to get up into the ceiling to make sure there are no obstructions for devices we are going to be installing?
-
Please take pictures.
-
Is client going to provide conduit for cabling?
-
Is client aware we will be using Panduit?
-
Please do visual inspection of the ceiling and identify any obstructions and add notes and pictures above.
-
Please take pictures of the room.
-
What kind of installation is this going to be?
- Display Installation
- Projector/Screen Installation
- Audio Only Installation
- Classroom w/ Projector
- Other
-
Are we able to install the display on the wall the client wants it on?
-
Work with client to come up with new plan of attack, and make notes above.
-
Please enter the height that the client would like the display at.
-
Is there going to be an equipment Rack?
-
Where is the rack going to be stored?
-
Please enter location.
-
Please enter measurement of location.
-
Does this location have enough ventilation?
-
Come up with a solution and input notes above.
-
Is there power at the rack location?
-
Is it a 20A or 15A circuit?
-
Are we installing external speakers?
-
Which kind of speakers are we installing?
-
Is there sufficient clearance for the speaker to fit where it is called out to be?
-
Please take pictures and notes and figure out best solution and make note of decision above. (i.e. moving speaker(s), changing to different kind of speaker)
-
What color should the speakers be?
-
Please enter custom color. (*NOTE* This may have additional charges due to custom coloring)
-
When does this project need to be complete?
-
Who is the General Contractor?
-
Please provide General Contractor's information.
-
Are there weekly meetings?
-
What day of the week?
- Monday
- Tuesday
- Wednesday
- Thursday
- Friday
- Saturday
- Sunday
-
What time?
-
Is this a union job site?
-
Are we pulling our own cable?
-
Who is pulling our cable?
-
Do they have a current version of the pull schedule/drawings?
-
Who is the electrical vendor?
-
Are we hanging the display mounts?
-
Who is?
-
Do we need to coordinate with the furniture vendor? (Credenza's, Tables, ect.)
-
Who is the furniture vendor, and who is our contact?
Retrofit
New Construction
General Notes
-
Is reinspection required for non compliance
-
Client rep
-
Innova-Tech rep
-
Contractor rep
-
Planned date and time for reinspection