Title Page
-
Site Address
-
Incident Date
-
Sentinel No.
-
Duty Manager
- Gary Monaghan
- Brad Dyer
- Johan Snyman
- David Holhouse
- Michael Wright
- Rob Pesce
- Other
-
Incident Manager
- Adam Purton
- Ken McNeil
- Gavin Hanley
- Vlado Dimitrovski
- Jeff Webber
- Matt Sutherland
- Other
-
Prepared by (name)
-
Work order number
Water Incident
-
Is this a water incident?
-
Failure Mode
- Cracking
- Fitting failure
- Tree roots
- Damaged by others
- Joint failure
-
Provide the name /company who damaged this
-
Any additional information
-
Size of pipe (e.g 230mm)
-
Pipe type
- Cast Iron
- Asbestos Cement
- Ductile Iron
- Reinforced Concrete
- Polyvinyl Chloride
- Medium Density Polyethylene
- High Density Polyethylene
- High Performance Polyethylene
- Copper
- Lead
- Galvanised Iron
- Vitrified Clay
-
Describe the burst (e.g water squirting 10mtrs in to air hitting customers roof)
-
Describe the flow rate
- Trickle
- Gushing
- Flowing
- Intermittent
- Stopped
-
Traffic Management in place
-
Is this a main road
-
Number of lanes closed
- one
- two
- three
- four
-
Direction of traffic affected
- North
- South
- East
- West
-
Description of traffic management
-
Estimated time for road opening
-
Is a road reinstatement required
-
Permanent reinstatement must be completed with in 24 hours. If this can not be left safe traffic management must be left in place until permanent reinstatement is completed.
-
Water off time (last valve turned)
-
Water on time (first valve turned)
-
Is it likely to exceed six hours
-
Estimated time to repair
-
Number of affected properties
-
Are there any key customers affected (refer Key Customer Manager Contact list)
Key Customer
-
Customer name
-
Customer contact number
-
Name, Street, Suburb
-
Key Customer Manager must be contacted
-
Any additional information / remedial action taken
-
Are there any home dialysis customers affected (refer Home Dialysis Listing)
Home Dialysis Customer
-
Customer name
-
Customer contact number
-
Name, Street, Suburb
-
Contact must be made with the customer
-
Additional information / remedial action taken
-
Bottled water on site
-
Enter location of bottled water
-
Did the burst cause damage to property
-
Did it cause any internal property damage
Property
-
Does customer have insurance
-
Building Insurance
-
Contents Insurance
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Did it cause any external property damage (Gardens, fences, etc)
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Contents Insurance
-
Did the burst cause damage to Canning / Swan River banks or erosion
-
Contact must be made with Swan River Trust to obtain an emergency permit.
-
How many valves involved in the shut off
-
Were there any broken valves
-
Enter the quantity of broken valves
Waste Water Incident
-
Is this a waste water incident?
-
Failure Mode
- Blockage
- Pump Station Failure
- Pressure Main Failure/Pipe Collapse
-
Pipe type
- Cast Iron
- Asbestos Cement
- Ductile Iron
- Reinforced Concrete
- Polyvinyl Chloride
- Medium Density Polyethylene
- High Density Polyethylene
- High Performance Polyethylene
- Copper
- Lead
- Galvanised Iron
- Vitrified Clay
-
Size of pipe (e.g 230mm)
-
Overflowing from
- Overflow Relief Gully
- Internal to building
- Access Chamber
- Inspection Shaft
- Other
-
Overflowing to an environmentally sensitive area (Check Intranet)
-
Describe the flow path (flowing across verge into road drain which joins the river)
-
Describe the flow rate
- Trickle
- Gushing
- Flowing
- Intermittent
- Stopped
-
What is the estimated discharge quantity (kL)
-
Is the wastewater contained
-
Where is it contained
-
Number of customers affected
-
Did the blockage cause any damage to customers property
-
Did it cause any internal property damage
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Content Insurance
-
Did it cause any external property damage
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Content Insurance
-
Are you aware of any history of complaints/sewer blockages
-
Has there been any odour complaints
-
Identified cause of blockage
- Fats
- Debris
- Roots
- Rags
- Sand
- Other
-
Name of Station, Street, Suburb
-
Identified cause
- SCADA failure
- Mechanical failure
- Electrical failure
- Other
-
Provide details
-
Is the pump station on the Environmentally Sensitive List? (Check Intranet)
-
WW Visible
-
Overflowing from
- Pump Station
- Access Chamber
- Inspection Shaft
- Designated Overflow Point
- Other
-
Describe the flow path (flowing across verge into road drain which joins river)
-
Describe the flow rate
- Trickle
- Gushing
- Flowing
- Intermittent
- Stopped
-
What is the estimated discharged quantity? (kL)
-
Where is the location of the pump stations overflow point? (Check AMOSS for contingency plans)
-
Time to overflow
-
Are there any upstream stations pumping into the catchment
-
Enter the name of upstream station
-
Can these be remotely inhibited/isolated with minimal risk
-
Contact the Operations Centre to remotely inhibit
-
Is the wastewater contained
-
Where is it contained?
-
Where is the nominated tankering point
-
Did the WWO cause any damage to customers property
-
Did it cause any internal property damage
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Content Insurance
-
Did it cause any external property damage
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Content Insurance
-
Has there been odour complaints in the area
-
Is there the potential for a reportable overflow to occur
-
Likely to overflow from
- Pump Station
- Access Chamber
- Inspection Shaft
- Designated Overflow Point
- Other
-
Likely flow path (flowing across verge into road drain which joins river)
-
Where is the location of the pump stations overflow point? (Check AMOSS for contingency plans)
-
What is the time to overflow for the pump station? (Check AMOSS)
-
Are there any upstream stations pumping into the catchment?
-
Enter name of upstream station
-
Can these be remotely inhibited/isolated with minimal risk
-
Contact the Operations Centre to remotely inhibit
-
Where is the nominated tankering point?
-
Is this a result of damage by others
-
Provide the name / company who damaged this
-
Any additional information
-
Pipe type
- Cast Iron
- Asbestos Cement
- Ductile Iron
- Reinforced Concrete
- Polyvinyl Chloride
- Medium Density Polyethylene
- High Density Polyethylene
- High Performance Polyethylene
- Copper
- Lead
- Galvanised Iron
- Vitrified Clay
-
Size of pipe (e.g 230mm)
-
Overflowing from
- Overflow Relief Gully
- Internal to building
- Access Chamber
- Inspection Shaft
- Other
-
Overflowing to an environmentally sensitive area
-
Describe the flow path (flowing across verge into road drain which joins river)
-
Describe the flow rate
- Trickle
- Gushing
- Flowing
- Intermittent
- Stopped
-
What is the estimated discharge quantity (kL)
-
Is the wastewater contained
-
Where is it contained
-
Number of customers affected
-
Did it WWO cause any damage to customers property
-
Did it cause any internal property damage
Property
-
Customers name
-
Customers contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Content Insurance
-
Did it cause any external property damage
Property
-
Customers name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Remedial action taken
-
Does the customer have insurance
-
Building Insurance
-
Contents Insurance
-
Traffic management in place
-
Is this a main road
-
Number of lanes closed
- one
- two
- three
- four
-
Direction of traffic affected
- North
- South
- East
- West
-
Estimated time for road opening
-
Is a road reinstatement required
-
Permanent reinstatement must be completed with in 24 hours. If this can not be left safe traffic management must be left in place until permanent reinstatement is completed.
Drainage
-
Is this a drainage incident?
-
Is there a main drain overflow due to heavy rain event
-
Are the drainage inlet/outlet structures clear of debris
-
Is there evidence of pollution by a third party
-
Type of pollution
- Debris
- Hydrocarbon
- Detergents
- Other
-
Additional information obtained
-
Appropriate information must be obtained and reported to DER
-
Did it cause any damage to property
-
Did it cause any internal property damage
Property
-
Customer name
-
Customer contact number
-
Number, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Main Insurance Assessors, Laurie Butler, 0411 186 730
- Richstar Holdings, Brian Sowden, 0418 952 220
- Encompass Construction Risk Services, Douglas Bicknell, 0419 929 095
- Western Assessors, John Riley, 0418 959 611
- LAC, Chris Cook, 0418 924 015
-
Does the customer have insurance
-
Building Insurance
-
Contents Insurance
-
Remedial action taken
-
Did it cause any external property damage
Property
-
Customer name
-
Customer contact number
-
Name, Street, Suburb
-
Description of damage
-
Estimated value of damage
-
Was a loss adjuster engaged
-
Loss Adjuster
- Yes
- No
- N/A
-
Does the customer have insurance
-
Building Insurance
-
Contents Insurance
-
Remedial action taken
Other
-
Is this an "OTHER" Incident?
-
Has DFES reported incident where our infrastructure is at risk due to fire
-
Details of infrastructure
Asset
-
Street, Suburb
-
Asset type
-
Describe affect on the system
-
Potential customer impact
-
Is this an accidental chemical release to the watercourse incident
-
Provide additional details
-
Is this an aquatic or wildlife death incident
-
Provide additional details
-
This is any marine fauna deaths that is adjacent or near our drain (e.g at ocean outfall)
-
Is this a staining of receiving watercourse from construction incident
-
Provide additional details
-
Is this a Non-emission event/non-compliance with environmental conditions Incident?
-
Additional details
Communication
NOTIFICATIONS
-
INTERNAL PARTIES
-
Perth Regional Manager, PRA
-
Service Delivery Manager, PRA
-
Environmental Advisor, PRA
-
Finance and Administration, PRA
-
General Manager, MCSG
-
Manager, Environment and Aboriginal Affairs
-
Communications Branch
-
Security
-
Drinking Water Quality Branch
-
CIMC
-
Operations Centre
-
EXTERNAL PARTIES
-
Department of Environment and Regulation
-
Enter name of person and time of contact
-
Department of Health
-
Enter name of person and time of contact
-
Local Government Authority
-
Select Authority
- Armadale
- Bassendean
- Bayswater
- Belmont
- Cambridge
- Canning
- Claremont
- Cockburn
- Cottesloe
- East Fremantle
- Fremantle
- Gosnells
- Joondalup
- Kalamunda
- Kwinana
- Mandurah
- Melville
- Mosman
- Mundaring
- Murray
- Nedlands
- Peppermint Grove
- Perth
- Rockingham
- South Perth
- Stirling
- Subiaco
- Swan
- Victoria Park
- Vincent
- Wanneroo
-
Enter name of person and time of contact
-
Swan River Trust
-
Enter name of person and time of contact
-
Community Group
-
Enter Group name, name of person and time of contact
-
Department of Fire and Emergency Services
-
Enter name of person and time of contact
-
Other
-
Enter Department, name of person and time of contact
-
SMS notification text sent
Conclusion
MEDIA
-
Is there media interest
-
Contact must be made with Communications Branch
-
Provide details (e.g channel 7 on site taking photos)
CATEGORISATION
-
Minor Incident - WILL NOT cause harm or loss to a third party, environmental harm, generate media interest, endanger public health or safety
-
Significant / Moderate Incident - WILL cause damage or affect the function of infrastructure, environmental harm, significant local media interest, safety or health hazard, risk to regulatory compliance, damage to corporate reputation, damage or loss to a third party.
-
Major Incident - WILL cause extensive damage to infrastructure or property (>$100k), simultaneous significant incidents in more than one business unit, medium to long environmental harm, high level of media or stakeholder interest, serious death or injury, enduring damage to reputation, unacceptable financial loss or corporate fraud.
-
Severity of this incident
- Minor
- Moderate / Significant
- Major
DER REPORTING
-
Is a section 72 required
-
Name of responsible person to complete
-
Section 72 must be submitted with 24 hours from time of incident excluding weekends (e.g incident occurs 4.00pm Friday document due 4.00pm on the following Monday)
-
Required to be submitted on
-
If this timeframe can not be met an extension must be applied for and communications must be sent to the Correspondense Coordinator and Environmental Advisor.
-
Was an extension of time requested for the section 72 submission
-
Name of contact from Department of Environment and Regulations
-
New agreed time frame for submission of section 72
FURTHER INVESTIGATION
-
Do you believe a hot debrief is required?
-
Service Delivery Manager must be notified