1.0 AUDIT - INFORMATION
-
Is this audit for Pre-Acceptance of Works (AoW) or Pre-End Defect Liability Period (EDLP)
-
Is this audit for Sewer, Water or Recycled Water
- Sewer
- Potable Water
- Potable and Non Potable Water
-
Job No.
-
Retail Water Authority
-
Retail Water Authority Reference:
-
Contractor:
- Califam
- Pescatore
- Delplant
- R S Connell
- BMD
- Tunney and Houlihan
- Jayelle
- Yarra Valley Excavations
- Comdain
- Mooroolbark Excavations
-
Is contractors representative present for this audit
2.0 AUDIT - NON-CONFORMING ITEMS
-
Item 1<br><br>
-
Item 2
-
Item 3
-
Item 4
-
Item 5
-
Item 6
-
Item 7
-
Item 8
-
Item 9
-
Item 10
-
Item 11
-
Item 12
-
Item 13
-
Item 14
-
Item 15
-
Item 16
-
Item 17
-
Item 18
-
Item 19
-
Item 20
3.0 ALL NON-CONFORMANCES RECTIFIED
-
Date all items rectified
-
AoW or EDLP verification: