Title Page
-
Job No
-
Site Address
-
Start Date
-
Client
-
COC/NS Name
-
Prepared by
Removal Personnel Names
General Information
-
Consultant
-
Independent Consultant / Assessor
-
Contact Phone Number
-
Assessor License Number
-
Is the Assessor and Air monitoring Agents the same?
-
Air Monitoring Locations
-
Background air monitoring completed
-
Decon/s
-
Location 1
-
Location 2
-
Location 3
-
Location 4
-
Date of Monitoring: Results:
-
Friable
-
Non Friable
-
Modular Decon
-
Trailerised Decon
-
Pop Up Decon
-
Textured coating
-
ACM Dust
-
Lagging
-
ACM Soils
-
Millboard / durolux
-
Limpet
-
Damaged ACM sheeting
-
AC Plaster
-
ACM Rope
-
Other
Documentation
-
Worksafe Notification onsite
-
Current and relevant to works
-
Supervisor details correct
-
Asbestos Removal Control Plan onsite and relevant to the works
-
Site plan drawn up clearly showing locations to:
-
Decontamination facilities
-
Negative air locations
-
Enclosure set up
-
Emergency assembly point
-
Disposal routes and bin set up
-
First aid / fire fighting equipment
-
JSEA / SWMS onsite Communicated and signed off by all removal personnel
-
Relevant ARCP's / Guidelines available
-
Hazard Register
-
Additional hazards identified Communicated and signed off by all removal personnel
-
COC / Nominated Super copy onsite Relevant restrictions on COC / NS
-
Disposal permit applied for Worksite GPS ringfenced
-
Training Matrix onsite
-
All removal personnel
-
COC Log onsite
-
Competency Assessments
All other relevant documentation
-
Service isolations / disconnections
-
Emergency Procedures
-
Site inductions
-
Toolbox Meetings
-
SSSP
-
Asbestos Survey
-
Fit testing for RPD's
-
Air monitoring results
-
Medicals employees
Removal Personnel Competencies
-
ACA completed for all personnel
-
Use of Decontamination facilities
-
Correct use of PPE/C
-
Correct use of all other equipment
Exterior to Removal Area/s
-
Barriers in place to prevent entry
-
Entry / exits free from clutter
-
Hazard / warning signage
-
Danger Asbestos Signage
-
Other
Decontamination Facilities
-
Clean and tidy
-
Can be locked when not in use
-
Fit for intended purpose
-
NAU installed
-
Daily inspections recorded
-
H20 filtration installed & working
-
Cubicle doors seal correctly
-
Air monitoring in place
Removal area
-
All movable items cleared
-
Soft furnishings cleared
-
Other items fully covered
-
All ducts, voids sealed / covered
-
Enclosure lining
-
Dbl lining Black poly to floor
-
Lined to ceiling clear poly
-
Sticky side of tape not exposed
-
No lifting ends on tape
-
Plastic in good condition
-
No tears / rips
-
Overlay good
-
Viewing panel / camera installed
-
Sufficient supplies onsite
-
Obvious billowing in to enclosure
-
Visual inspection completed
-
Smoke test validation complete
-
Date of Smoke Testing Validation :
-
Verified by (Client / Independent):
-
Air pressure at 12Pa or greater pressure monitor installed and recording
-
Area free of clutter
-
Dust suppression during removal
-
ABC / PVA
-
Dust buster
-
Water misting / spray
-
No Asbestos debris
-
All ACM wrapped / bagged
-
NAU installed
-
Filters changed and recorded
Removal Equipment
Negative Air Units
-
DOP's / Service current and will be current for duration of job
-
NAU free of dust and debris
-
Ducting free of damage and rips
-
Air extracted to outside of Bldg
-
Ducting not laid on access ways
-
Filters / prefilters clean and regularly inspected / changed
-
7 day Records of Inspections onsite
NAU Register
-
NAU
HEPA Vacuums
-
Vacuums are H Class and comply with AS.NZS 60335.2
-
Bags installed and disposable
-
Filters clean / unclogged and changed regularly
-
Vacs are correctly sealed and no damage to outer casing
-
Vacs have current inspection certification ( every 6 mths)
-
Weekly inspections recorded
-
Vacs are clean and good cond
Vacuum Register
All electrical equipment tagged
-
HEPA vacs total No
-
NAU's total No
-
Electrical tools
-
Portable lighting
-
Leads
-
Decon water filter
-
Other:
-
Use of Life Guards onsite
Scaffolding is safe and fit for purpose
-
Fully planked
-
Guardrails
-
Access ladders
-
Correctly braced
-
All scaf pipes are sealed at both ends with tape or caps to prevent materials falling inside
-
Poly lining to platform
Tools appropriate and safe
-
Pre use inspections conducted
-
No damaged blades
-
Deadmans fitted and working
-
Guards fitted
Use of high pressure water blasters and compressors is prohibited for ACM removal
-
Are still using Water Blaster
Personnel wearing correct PPE/C
-
Respirators full/half
-
Coveralls
-
Safety glasses
-
Gloves
Personnel know to correctly
-
Fit Test conducted on all workers
-
Maintain / store PPE/C
The emergency alarm for this site is
Signed by Inspector
-
Add signature
-
Date & Time