Title Page

  • Job No

  • Site Address
  • Start Date

  • Client

  • COC/NS Name

  • Prepared by

Removal Personnel Names

General Information

  • Consultant

  • Independent Consultant / Assessor

  • Contact Phone Number

  • Assessor License Number

  • Is the Assessor and Air monitoring Agents the same?

  • Air Monitoring Locations

  • Background air monitoring completed

  • Decon/s

  • Location 1

  • Location 2

  • Location 3

  • Location 4

  • Date of Monitoring: Results:

  • Friable

  • Non Friable

  • Modular Decon

  • Trailerised Decon

  • Pop Up Decon

  • Textured coating

  • ACM Dust

  • Lagging

  • ACM Soils

  • Millboard / durolux

  • Limpet

  • Damaged ACM sheeting

  • AC Plaster

  • ACM Rope

  • Other

Documentation

  • Worksafe Notification onsite

  • Current and relevant to works

  • Supervisor details correct

  • Asbestos Removal Control Plan onsite and relevant to the works

  • Site plan drawn up clearly showing locations to:

  • Decontamination facilities

  • Negative air locations

  • Enclosure set up

  • Emergency assembly point

  • Disposal routes and bin set up

  • First aid / fire fighting equipment

  • JSEA / SWMS onsite Communicated and signed off by all removal personnel

  • Relevant ARCP's / Guidelines available

  • Hazard Register

  • Additional hazards identified Communicated and signed off by all removal personnel

  • COC / Nominated Super copy onsite Relevant restrictions on COC / NS

  • Disposal permit applied for Worksite GPS ringfenced

  • Training Matrix onsite

  • All removal personnel

  • COC Log onsite

  • Competency Assessments

All other relevant documentation

  • Service isolations / disconnections

  • Emergency Procedures

  • Site inductions

  • Toolbox Meetings

  • SSSP

  • Asbestos Survey

  • Fit testing for RPD's

  • Air monitoring results

  • Medicals employees

Removal Personnel Competencies

  • ACA completed for all personnel

  • Use of Decontamination facilities

  • Correct use of PPE/C

  • Correct use of all other equipment

Exterior to Removal Area/s

  • Barriers in place to prevent entry

  • Entry / exits free from clutter

  • Hazard / warning signage

  • Danger Asbestos Signage

  • Other

Decontamination Facilities

  • Clean and tidy

  • Can be locked when not in use

  • Fit for intended purpose

  • NAU installed

  • Daily inspections recorded

  • H20 filtration installed & working

  • Cubicle doors seal correctly

  • Air monitoring in place

Removal area

  • All movable items cleared

  • Soft furnishings cleared

  • Other items fully covered

  • All ducts, voids sealed / covered

  • Enclosure lining

  • Dbl lining Black poly to floor

  • Lined to ceiling clear poly

  • Sticky side of tape not exposed

  • No lifting ends on tape

  • Plastic in good condition

  • No tears / rips

  • Overlay good

  • Viewing panel / camera installed

  • Sufficient supplies onsite

  • Obvious billowing in to enclosure

  • Visual inspection completed

  • Smoke test validation complete

  • Date of Smoke Testing Validation :

  • Verified by (Client / Independent):

  • Air pressure at 12Pa or greater pressure monitor installed and recording

  • Area free of clutter

  • Dust suppression during removal

  • ABC / PVA

  • Dust buster

  • Water misting / spray

  • No Asbestos debris

  • All ACM wrapped / bagged

  • NAU installed

  • Filters changed and recorded

Removal Equipment

Negative Air Units

  • DOP's / Service current and will be current for duration of job

  • NAU free of dust and debris

  • Ducting free of damage and rips

  • Air extracted to outside of Bldg

  • Ducting not laid on access ways

  • Filters / prefilters clean and regularly inspected / changed

  • 7 day Records of Inspections onsite

NAU Register

  • NAU

HEPA Vacuums

  • Vacuums are H Class and comply with AS.NZS 60335.2

  • Bags installed and disposable

  • Filters clean / unclogged and changed regularly

  • Vacs are correctly sealed and no damage to outer casing

  • Vacs have current inspection certification ( every 6 mths)

  • Weekly inspections recorded

  • Vacs are clean and good cond

Vacuum Register

All electrical equipment tagged

  • HEPA vacs total No

  • NAU's total No

  • Electrical tools

  • Portable lighting

  • Leads

  • Decon water filter

  • Other:

  • Use of Life Guards onsite

Scaffolding is safe and fit for purpose

  • Fully planked

  • Guardrails

  • Access ladders

  • Correctly braced

  • All scaf pipes are sealed at both ends with tape or caps to prevent materials falling inside

  • Poly lining to platform

Tools appropriate and safe

  • Pre use inspections conducted

  • No damaged blades

  • Deadmans fitted and working

  • Guards fitted

Use of high pressure water blasters and compressors is prohibited for ACM removal

  • Are still using Water Blaster

Personnel wearing correct PPE/C

  • Respirators full/half

  • Coveralls

  • Safety glasses

  • Gloves

Personnel know to correctly

  • Fit Test conducted on all workers

  • Maintain / store PPE/C

The emergency alarm for this site is

Signed by Inspector

  • Add signature

  • Date & Time

Additional Comments / Obeservations

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.