Title Page
-
Confirm Site Address
-
Inspection Completed on
-
Delivery Date required
Site Information
-
Where will the material be delivered to
-
Flashings are installed correctly and ready for Hebel installation
-
Ensure flashings are installed prior to installation to avoid delays
-
Provide photo of completed flashing
-
All areas are framed correctly, and ready to accept tophats
-
Ensure all timber framing is complete prior to install to avoid delays
-
Provide photos of external walls
-
All beams above openings are flush or blocked to accept horizontal top hat (top hats to be fixed to timber at 600 mm spacings)
-
Ensure the framing is completed prior to install to avoid delays
-
Provide photos of above windows
-
Internal downpipes are connected and ready for Hebel completion
-
Ensure all internal downpipes are installed and connected prior to install to avoid delays
-
All windows and doors are installed correctly (plumb, level and secure)
-
Ensure all windows and doors are plumbed, levelled and secured before install to avoid delays
-
Wall wrap and DPC is installed correctly
-
Ensure all wall wrap and DPC are installed correctly before install to avoid delays
-
Provide photos of completed wall wrap and DPC installed correctly
-
Are the roof, fascia and gutter installed correctly to suit measurements of Hebel panels
-
Double check measurements and contact CSR to arrange changes if needed
-
Are all services are within the frame and battens can be freely installed
-
Ensure services are relocated prior to install to avoid delays
-
Frame has clear access for Hebel installers, hand rails blocking access are removed and a suitable work platform is in place to access walls
-
Ensure that all access areas are clear prior to install to avoid any delays
-
Provide photos of access around scaffolding
-
Is there safe access and availble space for crane truck to set up outriggers
-
Do not proceed with delivery and have site made ready for delivery
-
Is there a loading bay in place
-
Will the delivered products weight be within the listed maximum weight listed on scaff tag
-
Do not have delivery proceed until this can be addressed
-
Are the loading bay"s" rated heavy duty ( 675kgs) to take the load of delivered Hebel
-
Do not have the delivery take place until this is addressed
-
Will the delivered product be able to be point loaded across decking boards ( bearers not placed on one deck board)
-
Provide a photo of loading bays from main deck and Scaff tag
-
Ensure that timbers are placed under the load to spread weight across deck
-
Is there enough room to place materials on the ground
-
Make sure you have this made safer before delivery is booked
-
Provide photo of storage area
-
Is the site clear from overhead power lines
-
Ensure all appropriate permits are in place and conditions adhered to
-
Is the site free from other obstructions such as trees, workers vehicles and other items that may impede the delivery
-
Provide photo and description of obstruction and await CSR to confirm if delivery can take place
-
Provide photo from front of site and delivery area
Sign Off
-
I can confirm that if the crane operator arrives on site and feels there is anything unsafe in relation to craning up he will advise the Orbit representative and crane the material to ground level
-
I can confirm that the site is or will be ready for delivery and install of Hebel
-
Name and signature of person who completed the audit
-
Once completed make sure you email this document to the supplier in your call up