Title Page

  • Conducted on

  • Project name/number

  • Location
  • Prepared by

Utilities

  • Were both inside and outside perimeter of job site inspected for utilities?

  • Is the job site clear of utilities?

  • Location

  • Source

  • Type

General Work Area(s)

  • Is the job site fenced?

  • Is the job site clear of installation conflicts?

  • Type

  • Is the job site free of access restrictions?

  • Issue

  • Is there a lay down area for equipment?

  • Is the lay down area level?

  • Is the lay down area stable?

  • Is there a water source available?

  • Type

  • Are there toilets on site?

  • Is there designated parking for employees?

  • Location

Working Platform

  • Is there a level working grade?

  • Recommended improvements

  • Is there a stable working grade?

  • Recommended improvements

  • Is there evidence that the working platform has been disturbed?

  • Evidence

  • What was the abatement?

  • Are there other factors causing the platform to be pliable?

  • Type

  • Recommended improvements

  • Were soil borings reviewed?

  • Is the inspection in line with the report?

  • Was a visual inspection of the platform sufficient?

  • Testing performed

  • What technique is being performed?

  • What equipment is going to be on site?

Approval

  • I approve mobilization to this job site.

  • List improvements needed for mobilization

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.