Title Page
-
Pre-planting Checklist
-
The Lettuce Company
-
Prepared by
Planter/Tractor/Telehandler checks
-
Select date
-
Field Name
-
Have the planter checks been carried out?
-
Have he planter been checked for damage?
-
Have the Soucy tracks been greased and the nuts and bolts been checked to see if they have become loose?
-
Have the tractor and the telehandler been checked for damage?
-
Have the compressor belt been checked for damage?
-
Is starter fertiliser being used?
-
Check the fertiliser tines been checked for blockages or damage?
Safety checks
-
Has the front PTO guard been inspected for damage and is in suitable condition?
-
Have all staff been trained and signed off?
-
Is all fixed guards in place and in good condition?
-
Have all staff been issued with PPE and is it being worn?
-
Is the reversing alarm working and has it been tested?
Toilets, first aid, misc checks
-
Are the toilets in an acceptable condition? Is there enough stock of toilet roll, soap, sanitiser, water and paper towels?
-
Are the toilets located 10m away from the crop / water source / housing?
-
Is there sufficient stock in the first aid box?
-
Are fire extinguishers available in the planting tractor and mini bus?