Title Page
-
Site conducted
-
Conducted on
-
Client
-
Project No.
-
Location
-
Prepared by
-
Which areas/levels is this visit intended to review?
Site Contact Information
-
Primary Site Contact
-
Position
-
Primary Site Contact Number
-
Primary Site Contact Email Address
-
Secondary Site Contact
-
Position
-
Secondary Site Contact Number
-
Secondary Site Contact Email Adress
Offloading and Landing Decking Packs
-
Has the deck been delivered to site yet?
-
If no, what date is the deck required on site?
-
If the deck has already been landed, is it landed the correct way round?
-
What are the unloading facilities on site?
- Crane
- Forklift
- Site Labour
- None
- Offloaded & landed
- Offloaded but not landed
-
If none, what has been agreed as an alternative solution?
-
Is the client aware that they will be responsible for loading the deck on to the steelwork?
-
Additional comments:
Decking Installation Checklist
-
Is there safe means of access and egress to the working area?
-
Is the floor below our working area clear of any obstruction?
-
If no, has the client agreed to remove all obstructions prior to RMDP commencing on site?
-
Has all perimeter and internal edge protection been installed by the client prior to RMDP commencing on site?
-
If no, what date has the client agreed to have edge protection installed by?
-
Are there any areas which edge protection may obstruct the installation of edge trim?
-
If yes, which areas and can it be avoided?
-
Is the outer edge of the steel work accessible to install claws for safety netting?
-
Distance between underside of steel to floor
-
If safety netting is not achievable, what other safe means of working has been agreed.
-
Noise restrictions?
-
If yes, what times do they apply?
-
Site induction times.
-
On site parking available?
-
Additional Comments:
Shear Stud Installation Checklist
-
Are shear studs required?
-
Is the top flange of the steels free from any primer, paint or any material that will effect securing a weld?
-
If no, will the client remove all primer or paint prior to our shear stud installation?
-
Can the welding rig reach within 7.5m of the steels frame to secure an earth?
-
Are there any obstructions preventing the welding rig from being within 7.5m of the steel frame?
-
Has the client agreed to remove all obstructions to ensure we can secure an earth to the steel frame?
-
Is there suitable lifting equipment on site to lift stud barrels to level?
-
Has the client agreed to lift the stud barrels to level? (Approx. 200kg a barrel)
-
Additional Comments:
Additional Comments from Client
-
undefined
Signatures of Agreements
-
RMDP Representative - I have read and understood what has been agreed within this document
-
Client - I have read and understood what has been agreed within this document