Base

  • Condition of site on arrival?

  • take photo of problem if site is poor

  • Explanation here of poor site

  • Have you checked RL to be correct as per plan

  • Is the base flat and level

  • if not what is the problem

  • Are step downs cut back at least 300mm as per pod plan

  • What is step down to alf

  • What is step down to garage

  • what is step down to porch

  • Have you cut back garage outside boundary to allow boards and pegs

  • Have you reported any breakages

  • Written description of damage

  • Add photo of damage

  • Are the top of piers exposed

  • what depth are piers drilled

  • Are the location of piers correct

  • how many piers have drilled

  • Have you dug strip footing in correct location is it 200mm under required depth

  • Is DEB edge beam in correct location and depth. Have you also checked all re entries

  • Add photo of clean strip footing

  • Are all gates closed

  • Is there any problem on site that need to be reported

  • Add photo of any problems

  • Add photos of completed base

  • Add photo of gates closed of leaving site

  • Is the entry clear and excess crushed rock spread

  • location
  • Sign

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.