Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SECTION 1 : GENERAL
-
Site Location e.g. Pole / Tower No. / Feeder
-
Work Activity / Task Description
-
What is the Line Voltage being worked on
-
Safe Approach Distance for Authorised Person
-
Safe Approach Distance for Plant
-
Safe Approach Distance for Live Line
-
SWMS / SWP / WI Numbers used on site
SECTION 2 : SITE PRE-START CHECKS
-
Where is the Nearest First Aid equipment
-
Where is the Emergency Evacuation Area
-
Have all personal completed a Site Induction
-
Do Personal hold the relevant tickets / Cert. for the task being done e.g. High Risk / Electrical Linesperson / White Card
-
Has all equipment been inspected prior to use e.g. Tagged and in test date and visually look at
-
Are weather conditions going to impact on the job and is it SAFE to start
SECTION 3 : PERMITS
-
Is a EPA / VA required for this Task
-
Is a Working at heights / Confined spaces / Hotworks required for the task
-
Have you identified the correct Circuit before you Test and prove DEAD the line before applying work earths
SECTION 4 : PERSONAL PROTECTIVE EQUIPMENT
-
Are personal wearing the Mandatory PPE, e.g. Hard hat, eye protection, steel cap footwear, gloves, full body Hi Vis coveralls and as required safety harness, ear protection.
SECTION 5 : HAZARD AND CONTROLS
1. WORKING AT HEIGHTS
-
1.1 Is there a RISK of Falls of 2m or more? (including pits and trenches, holes, Working out of an EWP, Crane cage, climbing)
-
1.2 Is there a RISK that personal are not trained e.g. Rescue, working at heights Electrical shock
-
1.3 Is there a RISK of Plant e.g. Tipping, crushing, falling out of basket, Electrical shock
-
1.4 Can safe Approach Distances be Maintained at all times or is a Safety Observer required and Name
2. PLANT AND EQUIPMENT
-
2.1 Is there a RISK of Break down, crushing, tipping, uneven ground conditions, High winds, etc.
-
2.2 Is there a RISK of Equipment failure e.g. Not in test date, has not been inspected prior to use
3. LADDERS
-
3.1 Is there a RISK of Ladder breaking, crushing, manual handling, Not inspected, Electrical shock
4. SCAFFOLDS
-
4.1 Is there a RISK of scaffolds tipping, crushing, manual handling, Incomplete, exceeding SWL limits
5. MANUAL HANDLING
-
5.1 Is there a RISK of Personal injury, crushing, plant.
6. HAZARDOUS CHEMICAL (INCLUDING FUEL AND OIL)
-
6.1 Is there a RISK to Personal, other work groups
-
6.2 Are MSDS sheets accessible, is there enough storage
7. TRAFFIC MANAGEMENT
-
7.1 Is there a RISK of getting run over by other vehicles. The public
8. WORK ENVIRONMENT
-
8.1 Is there a RISK of slips, trips and falls
-
8.2 Are there any house keeping issues, block emergency exits, plant and equipment in the way
-
8.3 Is there a RISK of working in the dark
9. ELECTRICAL HAZARDS
-
6.1 Is there a RISK of electrical shock from RCD, leads, lack of Lock-out/ tag
10. ENVIRONMENTAL
-
10.1 Is there a RISK to the environment, Oil spills, Wildlife, Vegetation, Farmers Land, etc
11. OTHER RISK / HAZARDS
-
11.1
-
11.2
-
11.3
-
11.4
-
11.5
SECTION 6 : WORK PARTY SIGN AFTER PRE-START TALK
-
Name and Company
-
Name and Company
-
Name and Company
-
Name and Company
-
Name and Company
-
Name and Company
SECTION 7 : VISITORS / CONTRACTORS SIGN OFF
-
Name and Company
-
Name and Company
-
Name and Company