Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

SECTION 1 : GENERAL

  • Site Location e.g. Pole / Tower No. / Feeder

  • Work Activity / Task Description

  • What is the Line Voltage being worked on

  • Safe Approach Distance for Authorised Person

  • Safe Approach Distance for Plant

  • Safe Approach Distance for Live Line

  • SWMS / SWP / WI Numbers used on site

SECTION 2 : SITE PRE-START CHECKS

  • Where is the Nearest First Aid equipment

  • Where is the Emergency Evacuation Area

  • Have all personal completed a Site Induction

  • Do Personal hold the relevant tickets / Cert. for the task being done e.g. High Risk / Electrical Linesperson / White Card

  • Has all equipment been inspected prior to use e.g. Tagged and in test date and visually look at

  • Are weather conditions going to impact on the job and is it SAFE to start

SECTION 3 : PERMITS

  • Is a EPA / VA required for this Task

  • Is a Working at heights / Confined spaces / Hotworks required for the task

  • Have you identified the correct Circuit before you Test and prove DEAD the line before applying work earths

SECTION 4 : PERSONAL PROTECTIVE EQUIPMENT

  • Are personal wearing the Mandatory PPE, e.g. Hard hat, eye protection, steel cap footwear, gloves, full body Hi Vis coveralls and as required safety harness, ear protection.

SECTION 5 : HAZARD AND CONTROLS

1. WORKING AT HEIGHTS

  • 1.1 Is there a RISK of Falls of 2m or more? (including pits and trenches, holes, Working out of an EWP, Crane cage, climbing)

  • 1.2 Is there a RISK that personal are not trained e.g. Rescue, working at heights Electrical shock

  • 1.3 Is there a RISK of Plant e.g. Tipping, crushing, falling out of basket, Electrical shock

  • 1.4 Can safe Approach Distances be Maintained at all times or is a Safety Observer required and Name

2. PLANT AND EQUIPMENT

  • 2.1 Is there a RISK of Break down, crushing, tipping, uneven ground conditions, High winds, etc.

  • 2.2 Is there a RISK of Equipment failure e.g. Not in test date, has not been inspected prior to use

3. LADDERS

  • 3.1 Is there a RISK of Ladder breaking, crushing, manual handling, Not inspected, Electrical shock

4. SCAFFOLDS

  • 4.1 Is there a RISK of scaffolds tipping, crushing, manual handling, Incomplete, exceeding SWL limits

5. MANUAL HANDLING

  • 5.1 Is there a RISK of Personal injury, crushing, plant.

6. HAZARDOUS CHEMICAL (INCLUDING FUEL AND OIL)

  • 6.1 Is there a RISK to Personal, other work groups

  • 6.2 Are MSDS sheets accessible, is there enough storage

7. TRAFFIC MANAGEMENT

  • 7.1 Is there a RISK of getting run over by other vehicles. The public

8. WORK ENVIRONMENT

  • 8.1 Is there a RISK of slips, trips and falls

  • 8.2 Are there any house keeping issues, block emergency exits, plant and equipment in the way

  • 8.3 Is there a RISK of working in the dark

9. ELECTRICAL HAZARDS

  • 6.1 Is there a RISK of electrical shock from RCD, leads, lack of Lock-out/ tag

10. ENVIRONMENTAL

  • 10.1 Is there a RISK to the environment, Oil spills, Wildlife, Vegetation, Farmers Land, etc

11. OTHER RISK / HAZARDS

  • 11.1

  • 11.2

  • 11.3

  • 11.4

  • 11.5

SECTION 6 : WORK PARTY SIGN AFTER PRE-START TALK

  • Name and Company

  • Name and Company

  • Name and Company

  • Name and Company

  • Name and Company

  • Name and Company

SECTION 7 : VISITORS / CONTRACTORS SIGN OFF

  • Name and Company

  • Name and Company

  • Name and Company

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.