Information

  • Fill out this Pre-Start & Toolbox Form for every New Task.

    Have the Lend Lease Representative sign this after you have conducted this pre-start.

    Once completed, email it to nominated Lend Lease representative.

  • Project Or Task Name.

  • Location
  • Conducted on.

  • Person Conducting Pre-Start and responsible for SWMS.

  • Document No.

Form

PRE-START INSPECTION

  • Peter Brown Pty Ltd recognises the importance of safety and environment being of prime importance on this Lend Lease asset. All work activities will be carried out with careful consideration of the safety and health implications to all those working on or near the works being undertaken. Due care will be taken to minimise any adverse environmental impacts. Management and employees of Peter Brown Pty Limited will work together with Lend Lease management and other site workers to achieve the project targets. Key aspects of Peter Brown Pty Ltd approach to safety management include: • Safety considerations built into the project planning. • All employees are required to be actively involved in site safety. • All employees and sub-contractors to have appropriate safety and environment inductions. • All high risk work processes to have an approved individual JSA or task analysis. • Employees and sub-contractors to have appropriate competencies for the job. • There will be pro-active identification and management of hazards and environmental risks. • All incidents, near miss events and property damage will be reported. • Emergency plans will be in place. • An individual Risk Assessment is to be completed on a daily basis for each and every Project or Task.

  • Image of area being accessed

  • Work location / area:

  • List possible Hazards for this project.

  • Any other identified hazards or work activities not listed above:

  • Are any deliveries expected for this project? Please make security aware.

TASK SEQUENCE

  • Site set up

  • Carpentry Task specific

  • Plumbing task specific

  • Plasterer task specific

  • Electrical task specific

  • Painter task specific

GENERAL ITEMS / ACTIVITY CHECKLIST

  • Was the previous Project activities issue free?

  • Are All workers instructed in relation to this projects work requirements?

  • Are all other trades and tenants notified of relevant activities in their area if required?

  • Is the Work area safe to commence works?

  • Are Workers adequately trained to complete tasks?

  • Are MEWPs, Fall Protection safe for use?

  • Electrical gear tagged tested and up to date

  • Are Weather conditions appropriate for commencement of works?

  • Will/are All workers signed on to Risk Assessment form?

  • Has a Risk Assessment been filled out for the activity not covered SWMS?

  • Are all exclusion zones and visual barriers erected and maintained? (High risk activities near public/public places need an exclusion zone)

  • PPE TO BE WORN AND USED

  • Do All workers have suitable PPE for all tasks?

  • Plant and equipment used

  • Site set up- what is the risk during set up

  • Sun exposure?

  • Noise - long term exposure

  • Objects on floor - uneven surface (risk of trips, slips, falls)

  • Dust or hazardous atmosphere

  • Contact with moving parts

  • Hazardous manual task (awkward twisting, bending, vibrations, repetitive movements)

  • Drilling operations - flying debris.

  • Has the Pre-Start been successful and can work commence?

PERMITS REQUIRED

  • Hot works permit

  • Roof access

  • Smoke detector isolation

  • Electrical and gas isolation

  • Confined spaces

  • Are all site specific permits filled out for this projects activities? (Hot works, roof access, working at heights, etc)

SWMS TO REFERENCED FOR THESE WORKS

  • Tick SWMS required.

  • SWMS 1 - general plumbing

  • SWMS 2 - storm water

  • SWMS 3 - large storm water

  • SWMS 4 - excavation and trenches

  • SWMS 6 - working in confined spaces

  • SWMS 7 - excavator

  • SWMS 8 - Skidsteer.

  • SWMS 9 - roller

  • SWMS 10 - angle grinder

  • SWMS 11 - drop saw

  • SWMS 13 - concrete works

  • SWMS 14 - demolition

  • SWMS 15 - laying sewer

  • SWMS 16 - power tools - general operations

  • SWMS 17 - construction night works

  • SWMS 18 - elevated work platform - scissor

  • SWMS 19 - elevated work platform - boom lift

  • SWMS 20 - hand tools

  • SWMS 21 - harness systems - fall arrest

  • SWMS 22 - working at heights

  • SWMS 23 - ladders

  • SWMS 24 - lock out tag out

  • SWMS 25 - manual handling

  • SWMS 26 - mitre saw

  • SWMS 27 - nail gun

  • SWMS 28 - power tools - explosive

  • SWMS 29 - pressure cleaner - jetta - petrol - diesel

  • SWMS 30 - scaffolding modular erecting

  • SWMS 31 - shop strip out

  • SWMS 32 - staple gun

  • SWMS 33 - timber framing

  • SWMS 34 - air compressor

  • SWMS 35 - carpentry fit off

  • SWMS

  • Is there a SWMS in place for all specific activities being undertaken for this project?

  • Were the identified issues rectified?

  • Any other items raised in this Pre-Start Inspection?

ATTENDEES - Names and Signatures

  • Peter Brown Pty Ltd Representative/supervisor. Brian Prosser.

  • Peter Brown Pty Ltd Representative/supervisor Tim Ditton.

  • Peter Brown Pty Ltd Representative: Joshua Prosser.

  • Peter Brown Pty Ltd Representative: James Tarasenko.

  • Peter Brown Pty Ltd Representative:

  • Peter Brown Pty Ltd Representative:

  • Peter Brown Pty Ltd Representative:

  • Peter Brown Pty Ltd Representative:

  • Other

  • Other

  • Lend Lease Represtative:

  • Add equipment

  • Equipment, plant, tools
The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.