Information

  • Audit Title

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

SYSTEM OPTIONS

  • DOES WORK ORDER COINCIDE WITH RO SYSTEM BEING BUILT?

SYSTEM ELECTRICAL

  • SYSTEM VOLTAGE

  • SYSTEM PHASE

  • SYSTEM HERTZ

  • ARE ALL ELECTRICAL WIRES SECURED? TUG ON EACH WIRE.

  • DOES GROUND WIRE WORK (USE MULTIMETER) CHECK ON DIFFERENT LOCATIONS ON THE FRAME?

  • IS MOTOR WIRING CORRECT?

  • DOES RESISTANCE OF COIL COINCIDE WITH VOLTAGE (USE MULTIMETER) 2500K FOR 220V 650K FOR 120v

  • IS THE CONTROLLER WIRED CORRECTLY?

  • IS THE POWER PLUG CORRECT?

  • ARE THE WIRES THE CORRECT SIZE?

PLUMBING

  • ARE THE PVC PIPES GLUED? USE A RUBBER MALLET.

  • IS THE CHECK VALVE GOING IN THE RIGHT DIRECTION?

  • ARE THE FITTINGS PROPERLY SECURED?

  • ARE ALL PVC UNIONS TIGHTENED?

  • ARE THE FLOW METER UNIONS SECURED?

LABELS

  • ARE THE LABELS COMPLETE?

  • ARE THE LABELS ALIGNED?

NUTS AND BOLTS

  • ARE ALL BOLTS SECURED?

FRAME

  • IS THE FRAME ALIGNED?

  • IS THE POWDER COATING ACCEPTABLE?

  • ARE THE PRESSURE VESSELS ALIGNED?

  • SYSTEM PICTURE

  • ASSEMBLER

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.