Information
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
SYSTEM OPTIONS
-
DOES WORK ORDER COINCIDE WITH RO SYSTEM BEING BUILT?
SYSTEM ELECTRICAL
-
SYSTEM VOLTAGE
-
SYSTEM PHASE
-
SYSTEM HERTZ
-
ARE ALL ELECTRICAL WIRES SECURED? TUG ON EACH WIRE.
-
DOES GROUND WIRE WORK (USE MULTIMETER) CHECK ON DIFFERENT LOCATIONS ON THE FRAME?
-
IS MOTOR WIRING CORRECT?
-
DOES RESISTANCE OF COIL COINCIDE WITH VOLTAGE (USE MULTIMETER) 2500K FOR 220V 650K FOR 120v
-
IS THE CONTROLLER WIRED CORRECTLY?
-
IS THE POWER PLUG CORRECT?
-
ARE THE WIRES THE CORRECT SIZE?
PLUMBING
-
ARE THE PVC PIPES GLUED? USE A RUBBER MALLET.
-
IS THE CHECK VALVE GOING IN THE RIGHT DIRECTION?
-
ARE THE FITTINGS PROPERLY SECURED?
-
ARE ALL PVC UNIONS TIGHTENED?
-
ARE THE FLOW METER UNIONS SECURED?
LABELS
-
ARE THE LABELS COMPLETE?
-
ARE THE LABELS ALIGNED?
NUTS AND BOLTS
-
ARE ALL BOLTS SECURED?
FRAME
-
IS THE FRAME ALIGNED?
-
IS THE POWDER COATING ACCEPTABLE?
-
ARE THE PRESSURE VESSELS ALIGNED?
-
SYSTEM PICTURE
-
ASSEMBLER
-
Select date