Information
-
Audit Title
SYSTEM WORK ORDER INFORMATION
-
DOES WORK ORDER COINCIDE WITH RO SYSTEM AND PAPER WORK COMPLETE ? TAKE A PICTURE
-
ARE THERE ANY OPTIONS ON THE SYSTEM ?
-
DOES THE SYSTEM REQUIRE PRIVE LABELING ?TAKE A PICTURE
SYSTEM ELECTRICAL
-
SYSTEM VOLTAGE , PHASE AND HERTZ
- 120v 1ph 60hz
- 120v 1ph 50hz
- 220v 1ph 60hz
- 220v 1ph 50hz
- 220v 3ph 60hz
- 220v 3ph 50hz
- 380v 3ph 50hz
- 480v 3ph 60hz
- 120v 1ph 60/50hz
- 220v 1ph 60/50hz
-
ARE ALL ELECTRICAL WIRES SECURED? TUG ON EACH WIRE.
-
DOES GROUND WIRE WORK (USE MULTIMETER) CHECK ON DIFFERENT LOCATIONS ON THE FRAME?
-
IS THE LOW PRESSURE SWITCH WIRED CORRECTLY ? TAKE A PICTURE
-
IS MOTOR WIRING CORRECT? Take picture
-
IS THE CONTROLLER WIRE CORRECTLY ? Take picture
-
IS THE HIGH PRESSURE SWITCH WIRED CORRECTLY ? TAKE A PICTURE
-
IS THE TANK FULL SWITCH WIRED CORRECTLY ? TAKE A PICTURE
-
IS THE POWER PLUG WIRED CORRECTLY? TAKE A PICTURE
-
IS THE CHEMICAL INJECTION OUTLET & PLUG WIRED CORRECTLY ? Take picture
-
IS THE CHEMICAL INJECTION PLUG WIRED CORRECTLY? TAKE A PICTURE
-
ARE THE WIRES THE CORRECT SIZE?
PLUMBING
-
ARE THE FLOW METERS / GAUGES COINCIDE WITH THE WORK ORDER ? Take a picture
-
ARE ALL PVC UNIONS TIGHTENED?
-
IS THE CHECK VALVE GOING IN THE RIGHT DIRECTION? Take picture
-
ARE THE PRESSURE VESSELS ALIGNED / SECURE ?
-
ARE THE NEEDLE VALVES GOING THE RIGHT DIRECTION ?<br>
PRE QC SIGN OFF
-
PRE QC PICTURES
-
Select date
-
ASSEMBLER
-
QC TECH