Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
HSEC
-
1. Pre-start discussion held with crews - highlight topic in the comment section.
-
2. Communication of previous shifts hazards - highlight topic in the comment section.
-
3. All work area light vehicle pre-starts completed and submitted for work area.
-
4. Authorized dig plans in place and adhered to.
-
5. Is the area free of interaction issues with other departments. - if No enter in comments
-
6. Are Positive Communication being used.
-
7. Are instructions / guidelines from the OCE report / Geotech guidelines being followed
Haul Roads and Ramps
-
14. Entry signage and traffic signage in place and maintained.
-
15. Road to the correct width (Minimum CAT 785 -24m, 789 -27m, 793/830 - 30m)
-
16. Haul roads maintained and in good order.
-
17. Corner cambers in place and center bunding on downhill high-speed corners.
-
18. Delineators every 100 meters.
-
19. Suitable road sheeting applied and adequate.
Digger Relocations
-
If the digger has relocated during the shift, or will relocate next shift, has the dig / flitch start point been inspected and validated by senior supervisor
Bench and Loading Area
-
21. Compliant to dig face and batter plan designs.
-
22. Dig face less than cab height on excavators.
-
What is the process to mitigate / deal with hazard
-
What is the process
-
23. Crest Line free of rocks and hazards.
-
24. High wall and dig face bunding in place.
-
25. High wall is free of cracking or water issues
-
26. Bunding has remained the same for active dig area during shift?
-
27. Night shift lighting is adequate with appropriate bunding
-
29. Designated light vehicle park up area has been established and maintained.
Dump Area
-
30. Area dump heights less than 20 meters?
-
Is a JSA in place
-
32. Dump area is free of cracks and drainage controls in place?
-
33. Access to the toe of all dumps are bunded off to all traffic.
-
34. Toe of dump is free of water and if not, is dumping short and dozing occurring under a JSA?
-
35. Compliant to dump plan designs.
Coal Mining
-
Have I received Geology approval before relocating Excavator?
-
Has Senior Supervisor inspected the area and taken photos?
-
Have I notified Geology / Survey for top of coal approval prior to altering/mining the exposed surface?
-
Has Senior Supervisor inspected the are and taken photos
-
Do I understand all actions from Geology?
-
Do I have a copy of the Geoplan and have an understanding?
ROM
-
36. Is there adequate lighting on the ROM?
-
38. Is there adequate drainage?
Weather
-
Is dry weather forecast for the shift?
-
Is plant and equipment safe from flooding
-
Are contingencies in place for heavy rainfall to mitigate risk to equipment
Go-Lines
-
11. All signage in place.
-
12. Sufficient lighting for Nightshift operations.
-
13. Park bays free of water & trip hazards.
Crib Hut
-
8. Area free of trip hazards.
-
9. Area free of rubbish and debris.
-
10. Sufficient lighting for Nightshift operations.
Float
-
Float ramp inspected, barricaded and compliant to design
Completion
-
General Notes/Comments
-
Supervisor