  • 1. Pre-start discussion held with crews - highlight topic in the comment section.

  • 2. Communication of previous shifts hazards - highlight topic in the comment section.

  • 3. All work area light vehicle pre-starts completed and submitted for work area.

  • 4. Authorized dig plans in place and adhered to.

  • 5. Is the area free of interaction issues with other departments. - if No enter in comments

  • 6. Are Positive Communication being used.

  • 7. Are instructions / guidelines from the OCE report / Geotech guidelines being followed

Haul Roads and Ramps

  • 14. Entry signage and traffic signage in place and maintained.

  • 15. Road to the correct width (Minimum CAT 785 -24m, 789 -27m, 793/830 - 30m)

  • 16. Haul roads maintained and in good order.

  • 17. Corner cambers in place and center bunding on downhill high-speed corners.

  • 18. Delineators every 100 meters.

  • 19. Suitable road sheeting applied and adequate.

Digger Relocations

  • If the digger has relocated during the shift, or will relocate next shift, has the dig / flitch start point been inspected and validated by senior supervisor

Bench and Loading Area

  • 21. Compliant to dig face and batter plan designs.

  • 22. Dig face less than cab height on excavators.

  • What is the process to mitigate / deal with hazard

  • What is the process

  • 23. Crest Line free of rocks and hazards.

  • 24. High wall and dig face bunding in place.

  • 25. High wall is free of cracking or water issues

  • 26. Bunding has remained the same for active dig area during shift?

  • 27. Night shift lighting is adequate with appropriate bunding

  • 29. Designated light vehicle park up area has been established and maintained.

Dump Area

  • 30. Area dump heights less than 20 meters?

  • Is a JSA in place

  • 32. Dump area is free of cracks and drainage controls in place?

  • 33. Access to the toe of all dumps are bunded off to all traffic.

  • 34. Toe of dump is free of water and if not, is dumping short and dozing occurring under a JSA?

  • 35. Compliant to dump plan designs.

Coal Mining

  • Have I received Geology approval before relocating Excavator?

  • Has Senior Supervisor inspected the area and taken photos?

  • Have I notified Geology / Survey for top of coal approval prior to altering/mining the exposed surface?

  • Has Senior Supervisor inspected the are and taken photos

  • Do I understand all actions from Geology?

  • Do I have a copy of the Geoplan and have an understanding?

ROM

  • 36. Is there adequate lighting on the ROM?

  • 38. Is there adequate drainage?

Weather

  • Is dry weather forecast for the shift?

  • Is plant and equipment safe from flooding

  • Are contingencies in place for heavy rainfall to mitigate risk to equipment

Go-Lines

  • 11. All signage in place.

  • 12. Sufficient lighting for Nightshift operations.

  • 13. Park bays free of water & trip hazards.

Crib Hut

  • 8. Area free of trip hazards.

  • 9. Area free of rubbish and debris.

  • 10. Sufficient lighting for Nightshift operations.

Float

  • Float ramp inspected, barricaded and compliant to design

Completion

  • General Notes/Comments

  • Supervisor

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.