Title Page

  • Site conducted

  • Conducted on

  • Shift

  • Handed From

  • Handed Over to

  • Prepared by

Handover

  • If a digger has relocated to a new dig/flitch during the shift, or will relocate during the next shift, has the start point been checked and validated?

  • EX 15

  • EX 935

  • EX 936

  • EX 921

  • EX 12

  • EX 931

  • EX913

  • LDR 259

  • Other

  • Prestart Discussion Required

Sign Off

  • Off-Going Supervisor (Signature)

  • On-Coming Supervisor (Name and Signature)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.