Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Service Visit Type

  • Location

  • Plant Description

  • Asset Reference

RAMS

  • Risk assessment completed

  • Method statement completed

  • PPE

  • Engineer Initials

SFG 20 Procedure - Pressurisation Units (6M)

  • Diaphragm expansion vessel, isolate and drain, check cushion pressure.

  • Check closed valve pressure and pump capacity.

  • Check setting of high and low pressure cut-out switches.

  • Total de-gassing time.

  • Total refill time.

  • Total refill volume.

  • Pumps tested.

  • Unit degassing

  • Unit electrical connections checked

  • Unit sensors checked

  • Unit solenoid valves checked

Additional Comments

  • Report of any faults

Safety Checks

  • Inspection Completed

  • Area left safe

  • Area left clean

Polyteck Building Services, 143 Leman Street, London, E1 8EY

  • Engineer Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.