SFG 20 Procedure - Pressurisation Units (6M)
-
Diaphragm expansion vessel, isolate and drain, check cushion pressure.
-
Check closed valve pressure and pump capacity.
-
Check setting of high and low pressure cut-out switches.
-
Total de-gassing time.
-
Total refill time.
-
Total refill volume.
-
Pumps tested.
-
Unit degassing
-
Unit electrical connections checked
-
Unit sensors checked
-
Unit solenoid valves checked
Additional Comments
-
Report of any faults