Title Page
-
Conducted on
-
Auditor
-
Location
-
Process audited
- SPS 1A - Work instructions standardized work
- SPS 1B - Short interval production and quality tracking
- SPS 2A - Short interval management Cycle 1 & 2
- SPS 2D - Communication SIM boards
- SPS 3B - Learning and development Flexibility and versatility
- SPS 3C - 5S Visual management
- SPS 3D - Idea system
- SPS 4A - Process architecture line
- SPS 4B - Process architecture factory warehouse
- SPS 4D - MPH Evacuation and replenishment process
- SPS 5A - Ergonomics
- SPS 5C - Safety
- SPS 6A - Process robustness
- SPS 6D - Total productive maintenance
- SPS 7A - Master production planning
- SPS 7B - Production control
- SPS 8C - Replenishment strategy
- SPS 9A - Supplier quality
- SPS 9B - Downstream Supply Chain management
- SPS 9C - Collaborative Quality management
- SPS 9D - Customer focus
- SPS 9E - Upstream supplier management and procurement
- Quality control
-
Operators are trained and understand OWS, JBS, SPL and Quality Alerts. Documents are used during training/production
-
Operator can explain how to use SIM skema/LDS and respects it. At least 80% of red time is explained. Operator can explain what is KE/OEE/MDR. Scrap and rework is treated by the end of the shift (exceptions can be explained).
-
SIM audit is regularly performed and feedback is given
-
Traffic light and escalation process is in place and known by operators and support functions
-
Flexibility and versatility matrix is in use and up-to-date
-
5S audit is performed and trend is monitored
-
Suggestion system process (registration and follow-up) is known
-
Queue simulation tool is quarterly updated for capacity analysis (linked with MPP)
-
Cycle counting program is in place and respected
-
Finished goods evacuated every 1 - 2 hours. Waste evacuated 1 - 2 times/shift
-
Process to identify lifts and loads over 10kg is in place and used for all change in the process
-
Safety escalation process is known in case of incident
-
Poka Yoke and Jidoka are verified on a regular basis and operator or maintenance know what to do accordingly
-
Maintenance: preventive maintenance (PM) is done on time and time spent is tracked; critical spare parts are available < 1day and stock accuracy is >95%.
-
Production: autonomous maintenance is respected by the operator
-
Quality: metrology and calibration process is applied and tasks are done on time
-
MPP process is fully deployed with demand plan and stock targey. Standard template for action plan in use to register decisions and actions
-
Production control priority rules are known and respected by production (1 Shortage, 2 Pre shortages, 3 MTO, 4 MTS)
-
MRP is used without help of manualsand understood by Supply Chain
-
Upstream: quality of PPEP effectiveness is monitored and improved (not empty). For all PRBs in bFO, 8D is in use and the 4 legs of RCA are done
-
SIOP process confirmation
-
Process and flow qualification plan (PFQP) used for validation whenever there is a process change and new line design
-
In-house: for all PRBs in bFO, 8D is in use and the 4 legs of RCA are done and lead time is respceted
-
Express transportation process is in place and respected
-
Quality control is performed according to process (beginning, during and at the end of the shift)
-
Result af the audit
-
Action to close the gap
-
To be open in