Title Page

  • Conducted on

  • Auditor

  • Location
  • Process audited

  • Operators are trained and understand OWS, JBS, SPL and Quality Alerts. Documents are used during training/production

  • Operator can explain how to use SIM skema/LDS and respects it. At least 80% of red time is explained. Operator can explain what is KE/OEE/MDR. Scrap and rework is treated by the end of the shift (exceptions can be explained).

  • SIM audit is regularly performed and feedback is given

  • Traffic light and escalation process is in place and known by operators and support functions

  • Flexibility and versatility matrix is in use and up-to-date

  • 5S audit is performed and trend is monitored

  • Suggestion system process (registration and follow-up) is known

  • Queue simulation tool is quarterly updated for capacity analysis (linked with MPP)

  • Cycle counting program is in place and respected

  • Finished goods evacuated every 1 - 2 hours. Waste evacuated 1 - 2 times/shift

  • Process to identify lifts and loads over 10kg is in place and used for all change in the process

  • Safety escalation process is known in case of incident

  • Poka Yoke and Jidoka are verified on a regular basis and operator or maintenance know what to do accordingly

  • Maintenance: preventive maintenance (PM) is done on time and time spent is tracked; critical spare parts are available < 1day and stock accuracy is >95%.

  • Production: autonomous maintenance is respected by the operator

  • Quality: metrology and calibration process is applied and tasks are done on time

  • MPP process is fully deployed with demand plan and stock targey. Standard template for action plan in use to register decisions and actions

  • Production control priority rules are known and respected by production (1 Shortage, 2 Pre shortages, 3 MTO, 4 MTS)

  • MRP is used without help of manualsand understood by Supply Chain

  • Upstream: quality of PPEP effectiveness is monitored and improved (not empty). For all PRBs in bFO, 8D is in use and the 4 legs of RCA are done

  • SIOP process confirmation

  • Process and flow qualification plan (PFQP) used for validation whenever there is a process change and new line design

  • In-house: for all PRBs in bFO, 8D is in use and the 4 legs of RCA are done and lead time is respceted

  • Express transportation process is in place and respected

  • Quality control is performed according to process (beginning, during and at the end of the shift)

  • Result af the audit

  • Action to close the gap

  • To be open in

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.