Title Page
-
Conducted on
-
Prepared by
-
Location
-
Document No
-
Conducted on
Details
-
Is all pipework free from pen marks?
-
Is all tape removed from pipework?
-
Has all weld discoloration marks been removed from pipework?
-
Are all decals present and correct to GA?
-
Are WCLU numbers correct?
-
Are asset numbers correct?
-
Are drip trays free from contamination?
-
Are all end caps fitted correctly?
-
Is paintwork satisfactory on the tank and frame?
-
Has all relevant welded area's been passed off by the NDT inspector?
Final inspection before passed off for PDI
-
Is all external pipework fitted correctly?
-
Are all non-return valves facing in the correct direction?
-
Are Relief valves at the correct pressure?
-
Are vent line support brackets fitted correctly?
-
Is the vaporiser data plate securely attached correctly?
-
Are all slings / other items within ISO frame and securely fastened?
-
Is there positive pressure in the tank (0.5 - 1.0 bar)
-
Is the DP gauge reading 0?
-
All applicable valves closed (travelling valve remains open)
-
Is the quality of the paintwork acceptable from the supplier?
-
Is the quality of the rework/touch up paint acceptable?