Title Page

  • Conducted on

  • Prepared by

  • Location
  • Document No

  • Conducted on

Details

  • Is all pipework free from pen marks?

  • Is all tape removed from pipework?

  • Has all weld discoloration marks been removed from pipework?

  • Are all decals present and correct to GA?

  • Are WCLU numbers correct?

  • Are asset numbers correct?

  • Are drip trays free from contamination?

  • Are all end caps fitted correctly?

  • Is paintwork satisfactory on the tank and frame?

  • Has all relevant welded area's been passed off by the NDT inspector?

Final inspection before passed off for PDI

  • Is all external pipework fitted correctly?

  • Are all non-return valves facing in the correct direction?

  • Are Relief valves at the correct pressure?

  • Are vent line support brackets fitted correctly?

  • Is the vaporiser data plate securely attached correctly?

  • Are all slings / other items within ISO frame and securely fastened?

  • Is there positive pressure in the tank (0.5 - 1.0 bar)

  • Is the DP gauge reading 0?

  • All applicable valves closed (travelling valve remains open)

  • Is the quality of the paintwork acceptable from the supplier?

  • Is the quality of the rework/touch up paint acceptable?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.