Information
-
PRODUCTION SUPERVISOR CHECK SHEET AND REPORT GENERATOR
-
DATE & TIME
-
SUPERVISOR NAME.
-
LINE NUMBER
- 1
- 2
- 3
- 4
- 5
- 6
- TAP RAILS
- KITS
-
DO YOU HAVE INITIAL COMMENTS OR OBSERVATIONS YOU WANT TO REPORT BEFORE STARTING THE DAILY CHECK SHEET AND REPORT ? (If yes please enter in text box below)
-
SIGNATURE
PERSONNEL CHECK-SHEET.
-
Are all personnel in attendance and clocked on? If no please enter name of operative and reason for none attendance or lateness.
-
Please confirm correct manning ( ops to be placed in correct positions on OEE sheet) please confirm any amendments if necessary.
-
Are all operatives trained to the correct skill level on the station they are working? ( please check H drive/entity 5/Skill level operators - tab per enact/temps) if no please enter training requirements below.
-
Are all RTW's (return to work) up to date? (must be complete the week operators return to work)
-
PLEASE ENTER ANY HOLIDAY REQUESTS FOR THE ATTENTION OF SUE WESTALL
-
Has KRONOS been checked & signed off?
PLANNING SCHEDULE.
-
Are all relevant parties aware of the production plan? Please check boxes below.
-
Production
-
Logistics
-
Quality
-
Print room
-
Kits
-
Please enter number of change overs.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
-
Have all changeovers been managed ( first off followed) by yourself or an alternative designated member of staff?
DAILY GENERAL LINE CHECK.
-
Is the ANDON fully operational to correct balance? IF NO ENTER ACTION TAKEN!
-
Are all FFT operatives signed in using their unique ID? IF NO ENTER ACTION TAKEN!
-
Is the agreed operator rotation being observed? IF NO ENTER ACTION TAKEN!
-
Are all operators using the correct ID stamps? IF NO ENTER ACTION TAKEN! details which need to be amended on H drive
-
Are the line work stations being kept in a clean safe manor, personal belongings removed from line and bottle holders in use or available? IF NO ENTER ACTION TAKEN!
-
Are all torque bins at the agreed stock level (2 bin system) IF NO ENTER ACTION TAKEN!
-
Are all operatives adhering to the agreed level of WIP (work in progress)? IF NO ENTER STATION NUMBER & ACTION TAKEN!
-
DRY TEST CHECK - is dry test equipment fully functional? IF NO ENTER ACTION TAKEN!
-
FFT CHECK - is FFT test equipment fully functional? IF NO ENTER ACTION TAKEN!
-
HOIST CHECK - Is hoist equipment fully functional? IF NO ENTER ACTION TAKEN!
-
POKE YOKE - Are all poke yoke's in use, maintained and in the correct location (standard)? IF NO ENTER ACTION TAKEN!
-
CASE SEAL CHECK - are the settings on the equipment correct - (Luna 2.5 / SS + Eco 1)? IF NO ENTER ACTION TAKEN!
DAILY STATION AUDIT X1.
-
Station number being audited.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
- 11
- 12
- 13
- 14
- 15
- FFT
-
Station letter ( if applicable).
-
Please insert picture of workstation being audited.
-
Is the workstation clean and tidy? IF NO ENTER ACTION TAKEN!
-
Are all the operators personal belongings removed from the work station? IF NO ENTER ACTION TAKEN!
-
Is the workstation set out in the correct format shown in the JEV? IF NO ENTER ACTION TAKEN!
-
Is the operator trained to the relevant level for the process they are performing? IF NO ENTER ACTION TAKEN!
-
Dose the operator have all the prescribed tools required to perform the process? IF NO ENTER ACTION TAKEN!
-
Are the tools calibrated and or suitable for the process being performed? IF NO ENTER ACTION TAKEN!
-
Is the Kanban stocked to suitable levels for the task to be performed? IF NO ENTER ACTION TAKEN!
-
Is the operator working within the relevant amount of WIP allowed? IF NO ENTER ACTION TAKEN!
-
Are there any maintenance issues that need addressing for the work station? IF NO ENTER ACTION TAKEN!
-
Is the operator performing the process to the JEV? IF NO ENTER ACTION TAKEN!
-
Enter operator comments.
-
Add supervisors actions.
-
Operators signature.
-
Is the operator demonstrating competence and understanding of the process they are performing? 1-3 in need of training 4-7 competent but would benefit from further training 8-10 competent efficient and proactive.
- 1
- 2
- 3
- 4
- 5
- 6
- 7
- 8
- 9
- 10
MAINTENANCE ISSUES.
-
Are all maintenance issues complete on the line? IF NO ENTER ACTION TAKEN!
-
Please add any other maintenance issues and action taken!
-
Please add any maintenance issue images.
DAILY CLOSE OUT.
-
Have all rejects been removed & recorded ? IF NO ENTER ACTION TAKEN!
-
ANDON - please confirm all issues raised from ANDON have been addressed e.g. Poor performance (training), quality, stoppages due to pars and equipment.
-
Has all data been entered into the daily production sheet? (FFT & In process)
-
Has Station Sustain been complete with findings from station audit and 5S?
ADDITIONAL INFORMATION.
-
PLEASE ADD ANY RELEVANT DETAILS YOU MAY WISH TO ADD TO THIS DAILY REPORT.
-
PLEASE ADD ANY ADDITIONAL IMAGES YOU MAY WANT TO ADD TO THIS DAILY REPORT.
GEMBA MEETING
-
Please enter any quality, maintenance, personnel, production or other issues raised in the GEMBA which need to be entered into this report.
-
Please enter any images if necessary.
-
SUPERVISORS SIGNATURE.
-
Report complete at.