Administrative
-
Review Production Schedule
-
Understand Packages planned to be run on each line
-
Review volumes and overall daily production plan
-
Validate raw material schedule and current floor inventory
-
Ensure partial pallets have been sent to appropriate work center
-
Calculate raw materials are adequate for batch quantities
-
Review Batching Status
-
First batch ready to run all lines
-
Batching on Schedule
-
Review warehouse space
-
Ensure line drivers are assigned
-
Review warehouse for available space
-
Comments and Pictures
-
Comments?
-
Picture if necessary
Support Area Review
-
Chemical Storage Area
-
Ensure cleaning material supply to support next 24 hours
-
CIP chemicals are in adequate supply to support the day
-
Ensure area is free of leaks
-
Area is organized and clean
-
Line Lubrication
-
Ensure area has adequate supply to support next 24 hours
-
Pumps are operational and working
-
Ensure area is free of leaks
-
Area is organized and clean
-
Boiler Room
-
Boiler pressure in the "green"
-
Boilers have adequate chemical supply for the day
-
Ensure area is free of leaks
-
Area is organized and clean
-
Ensure hot water heater for the plant is at correct temperature
-
NH3 Compressor Room
-
Review Draeger monitor to ensure all devices are in the green
-
Area is organized and clean
-
Air Compressors
-
Ensure PSI for each unit is in the "green"
-
Area is organized and clean
-
Water treatment
-
Pretreatment chemicals are in adequate supply next 24 hours
-
Ensure area is free of leaks
-
Area is organized and clean
-
UV system is working and in standard
-
Review clear well levels and ensure full supply for start up
-
Support Gases (CO2, N2)
-
Ensure pressure is in the "green"
-
Validate gas levels meet shift production needs
-
Comments and Pictures
-
Comments?
-
Picture if Necessary
Raw Materials
-
Ensure adequate shells, pads, boxes, labels, and paper board
-
Ensure adequate pallets in yard for production
-
Ensure raw materials and pallets are staged for production
-
Comments and Pictures
-
Comments?
-
Picture if necessary
Equipment Centers (Part 1)
-
Empty Bottles/Cans
-
Validate raw deliveries
-
Area is organized and clean
-
Ensure 100% cleaning station supply (brooms, shovels, and mops)
-
Depalletizer
-
Ensure data collection sheets are available
-
Validate package settings
-
Area is organized and clean
-
Ensure 100% cleaning station supply (brooms, shovels, and mops)
-
Combining Systems
-
Ensure data collection sheets are available
-
Validate package settings
-
Area is organized and clean - area free of fallen cans/bottles
-
Ensure 100% cleaning station supply (brooms, shovels, and mops)
-
Empty Bottling Handling
-
Ensure data collection sheets are available
-
Validate package settings
-
Area is organized and clean - area free of fallen cans/bottles
-
Ensure 100% cleaning station supply
-
Labeling system
-
Ensure data collection sheets are available
-
Validate package settings
-
Area is organized and clean
-
Ensure 100% cleaning station supply (brooms, shovels, mops)
-
Ensure glue pots on and adequate supply of glue for the day
-
Coding
-
Validate date setting for first SKU
-
Ink containers are full
-
Pressure settings is in the "green"
-
Area is clean and organized
-
Coder cleaning agents are nearby and ready for use
-
Rinser
-
Validate package settings
-
Area is organized and clean
-
Ensure 100% cleaning station supply
-
Ensure appropriate water type (Ozone or treated water)
-
Comments and Pictures
-
Comments?
-
Picture if necessary
-
Picture if necessary
Equipment Centers (Part 2)
-
Filling Room
-
Cap and Hopper is ready
-
First pallet (partial plus next full pallet) is staged
-
Cap hopper is filled
-
Blower pressure setting is in the "green" for size of cap
-
Ends
-
First pallet (partial plus next full pallet) is staged
-
Ends are filled to the seamer (with correct color end)
-
Filling Room overall
-
Area is organized and clean
-
Ensure 100% cleaning station supply
-
Data collection sheets are available
-
All line covers are in place
-
Filtec
-
Ensure proper operation, run test containers through filltechs
-
Full container conveyors
-
Lube soap is on and all nozzles are working
-
Seamer
-
Validate seamer is cleaned and lubricated
-
Oil Pressure and level is in the "green"
-
Shell System
-
Shells are staged
-
Denester full
-
Area is organized and clean
-
Ensure 100% cleaning station supply
-
Hi-Cone
-
Area is organized and clean
-
Ensure 100% cleaning station supply
-
Hi-Cone spliced and threaded
-
Comments and Pictures
-
Comments?
-
Picture if necessary
-
Picture if necessary
Equipment Centers (Part 3)
-
Warmers
-
Validate temperature setting with Dew Point requirement
-
Ensure screens are clean
-
Pumps are in the ON position
-
Packers
-
Data collection sheets are available
-
Validate package settings
-
Area is organized and clean
-
Interior rails and belts are clean and not tacky
-
Ensure 100% cleaning station supply
-
Ensure glue pots on and adequate supply of glue for the day
-
Ensure ovens are turned on (if applicable PSP/WSP)
-
Raw materials for first package are staged
-
Ensure first package is loaded (or threaded)
-
Full Case Conveyor
-
Conveyor system is turned on
-
Clear of debris/left over product
-
Palletizer
-
Ensure data collection sheets are available
-
Validate package settings
-
Area is organized and clean
-
Ensure 100% cleaning station supply
-
Rails and rollers are clean and not tacky from soda, glue, or stickers
-
Stretch Wrapper
-
Stretch wrap is available in adequate supply for the day
-
Tensioners are set for appropriate prestretch
-
Pallet tags are on and have adequate supply of tape
-
Pallet tags are set for correct storage dates
-
Comments and Pictures
-