Title Page

  • Prepared by

  • Conducted on

Administrative

  • Review Production Schedule

  • Understand Packages planned to be run on each line

  • Review volumes and overall daily production plan

  • Validate raw material schedule and current floor inventory

  • Ensure partial pallets have been sent to appropriate work center

  • Calculate raw materials are adequate for batch quantities

  • Review Batching Status

  • First batch ready to run all lines

  • Batching on Schedule

  • Review warehouse space

  • Ensure line drivers are assigned

  • Review warehouse for available space

  • Comments and Pictures

  • Comments?

  • Picture if necessary

Support Area Review

  • Chemical Storage Area

  • Ensure cleaning material supply to support next 24 hours

  • CIP chemicals are in adequate supply to support the day

  • Ensure area is free of leaks

  • Area is organized and clean

  • Line Lubrication

  • Ensure area has adequate supply to support next 24 hours

  • Pumps are operational and working

  • Ensure area is free of leaks

  • Area is organized and clean

  • Boiler Room

  • Boiler pressure in the "green"

  • Boilers have adequate chemical supply for the day

  • Ensure area is free of leaks

  • Area is organized and clean

  • Ensure hot water heater for the plant is at correct temperature

  • NH3 Compressor Room

  • Review Draeger monitor to ensure all devices are in the green

  • Area is organized and clean

  • Air Compressors

  • Ensure PSI for each unit is in the "green"

  • Area is organized and clean

  • Water treatment

  • Pretreatment chemicals are in adequate supply next 24 hours

  • Ensure area is free of leaks

  • Area is organized and clean

  • UV system is working and in standard

  • Review clear well levels and ensure full supply for start up

  • Support Gases (CO2, N2)

  • Ensure pressure is in the "green"

  • Validate gas levels meet shift production needs

  • Comments and Pictures

  • Comments?

  • Picture if Necessary

Raw Materials

  • Ensure adequate shells, pads, boxes, labels, and paper board

  • Ensure adequate pallets in yard for production

  • Ensure raw materials and pallets are staged for production

  • Comments and Pictures

  • Comments?

  • Picture if necessary

Equipment Centers (Part 1)

  • Empty Bottles/Cans

  • Validate raw deliveries

  • Area is organized and clean

  • Ensure 100% cleaning station supply (brooms, shovels, and mops)

  • Depalletizer

  • Ensure data collection sheets are available

  • Validate package settings

  • Area is organized and clean

  • Ensure 100% cleaning station supply (brooms, shovels, and mops)

  • Combining Systems

  • Ensure data collection sheets are available

  • Validate package settings

  • Area is organized and clean - area free of fallen cans/bottles

  • Ensure 100% cleaning station supply (brooms, shovels, and mops)

  • Empty Bottling Handling

  • Ensure data collection sheets are available

  • Validate package settings

  • Area is organized and clean - area free of fallen cans/bottles

  • Ensure 100% cleaning station supply

  • Labeling system

  • Ensure data collection sheets are available

  • Validate package settings

  • Area is organized and clean

  • Ensure 100% cleaning station supply (brooms, shovels, mops)

  • Ensure glue pots on and adequate supply of glue for the day

  • Coding

  • Validate date setting for first SKU

  • Ink containers are full

  • Pressure settings is in the "green"

  • Area is clean and organized

  • Coder cleaning agents are nearby and ready for use

  • Rinser

  • Validate package settings

  • Area is organized and clean

  • Ensure 100% cleaning station supply

  • Ensure appropriate water type (Ozone or treated water)

  • Comments and Pictures

  • Comments?

  • Picture if necessary

  • Picture if necessary

Equipment Centers (Part 2)

  • Filling Room

  • Cap and Hopper is ready

  • First pallet (partial plus next full pallet) is staged

  • Cap hopper is filled

  • Blower pressure setting is in the "green" for size of cap

  • Ends

  • First pallet (partial plus next full pallet) is staged

  • Ends are filled to the seamer (with correct color end)

  • Filling Room overall

  • Area is organized and clean

  • Ensure 100% cleaning station supply

  • Data collection sheets are available

  • All line covers are in place

  • Filtec

  • Ensure proper operation, run test containers through filltechs

  • Full container conveyors

  • Lube soap is on and all nozzles are working

  • Seamer

  • Validate seamer is cleaned and lubricated

  • Oil Pressure and level is in the "green"

  • Shell System

  • Shells are staged

  • Denester full

  • Area is organized and clean

  • Ensure 100% cleaning station supply

  • Hi-Cone

  • Area is organized and clean

  • Ensure 100% cleaning station supply

  • Hi-Cone spliced and threaded

  • Comments and Pictures

  • Comments?

  • Picture if necessary

  • Picture if necessary

Equipment Centers (Part 3)

  • Warmers

  • Validate temperature setting with Dew Point requirement

  • Ensure screens are clean

  • Pumps are in the ON position

  • Packers

  • Data collection sheets are available

  • Validate package settings

  • Area is organized and clean

  • Interior rails and belts are clean and not tacky

  • Ensure 100% cleaning station supply

  • Ensure glue pots on and adequate supply of glue for the day

  • Ensure ovens are turned on (if applicable PSP/WSP)

  • Raw materials for first package are staged

  • Ensure first package is loaded (or threaded)

  • Full Case Conveyor

  • Conveyor system is turned on

  • Clear of debris/left over product

  • Palletizer

  • Ensure data collection sheets are available

  • Validate package settings

  • Area is organized and clean

  • Ensure 100% cleaning station supply

  • Rails and rollers are clean and not tacky from soda, glue, or stickers

  • Stretch Wrapper

  • Stretch wrap is available in adequate supply for the day

  • Tensioners are set for appropriate prestretch

  • Pallet tags are on and have adequate supply of tape

  • Pallet tags are set for correct storage dates

  • Comments and Pictures

  • Comments?

  • Picture if necessary

  • Picture if necessary

  • You have completed the Pre-Shift Checklist, please create PDF and email, thank you

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.