Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Control of Materials
-
Does the operator understand the actions which should have been completed by stores staff?<br>Does the operator understand the reasons for verify that Key Parts are correct?<br><br>Verify that the operator checks that the Key Parts verification has been signed by the stores operator.<br>Verify that the operator checks the Key Parts and initials the correct areas of the Materials Requisition Sheet.<br><br>Record the operator name and employee number.<br><br>Record what the operator would do if this was not signed?<br>Record the details of the response.<br>Take a photograph of the Material Requisition Sheet.<br><br>Was the response satisfactory?
-
Record competence level.
- Highly Skilled
- Good Working Knowledge
- General Awareness
- Needs Training
Station 1 Quality Control
-
Does the operator follow good ESD disciplines.<br><br>Verify that the operator has checked their wrist strap and shoes.<br>Verify that the operator has checked the air ionisers are operational.<br><br>Record the operator name and employee number.<br><br>Record the details of the response.<br>Take a photograph of the Records.<br><br>Was the response satisfactory?
-
Record competence level.
- Highly Skilled
- Good Working Knowledge
- General Awareness
- Needs Training
-
Does the operator follow good ESD disciplines.<br><br>Verify that the operator has checked their wrist strap and shoes.<br>Verify that the operator has checked the air ionisers are operational.<br><br>Record the operator name and employee number.<br><br>Record the details of the response.<br>Take a photograph of the Records.<br><br>Was the response satisfactory?
-
Record competence level.
- Yes
- No
- N/A