Title Page
-
Document No. 0001
-
Latex Special Process Appendix
-
Supplier:
-
Conducted on
-
Prepared by: Jose Junior Naraval
-
Location
General Requirements
-
All tools used to verify product and process parameters are calibrated.
-
Calibration records of the tools are present, up-to-date and are properly documented.
-
For in-house calibration, workers doing calibration are trained/certified.
Technical Data Sheet
-
All critical to quality raw materials have their own TDS and/or MSDS
-
All TDS and MSDS are documented and filed properly.
-
All requirements stated in the TDS/MSDS are followed.
-
Workers handling the TDS/MSDS are trained to work with the documents and are well-versed in the handling and treatment of raw materials.
Process Scheme
-
Supplier has created a process scheme for each IKEA-produced products.
-
Process scheme are designed to address IKEA's CTQ requirements
-
Workers are trained and strictly adhere to the process scheme.
Production Risk Assessment
-
Supplier has a detailed PFMEA in place for each type of article and for each line/technology.
-
PFMEA are strictly followed and ahered to by everybody involved.
-
Workers are trained to handle potential failures as indicated in the PFMEA scheme.
Data Collection and Control
Raw Materials
-
SBR latex are checked according to the minimum CTQ requirements (%solids, pH and viscosity)
-
Natural latex deliveries are checked according to the minimum CTQ requirements (%solids, pH, viscosity and MST)
-
Soap deliveries or produced in-house are checked sccording to the minimum CTQ requirements (%solids and pH)
-
Vulcanisation system deliveries or produced in-house are checked according to the minimum CTQ requirements (%solids, pH and viscosity).
-
Gelling agent deliveries or produced in-house are checked according to the minimum CTQ requirements ( %solids and pH).
-
Every batch of raw materials delivered are checked and are properly recorded.
-
Workers tasked to receive incoming raw materials are trained on how to handle deliveries including non-conformances.
Compounding Process
-
Actual amounts of materials added in the compound are recorded and monitored.
-
Maturation time of every batch are stricly adhered and are properly recorded.
-
Compound CTQ requirements (%solids, pH and viscosity) are checked before use.
-
Procedures are in place to handle non-conforming compounds.
-
Compounders are trained to handle non-conforming compounds.
-
Actions taken to any non-conforming compounds are well-documented and have complete traceability.
Foaming Process
-
Compound temperature are being constantly monitored before and during production.<br><br>Note: Recording every 2 hours
-
Foaming machine minimum CTQ requirements are constantly monitored and are properly recorded.<br><br>1. Main pump output<br>2. Mixing head speed<br>3. Mixing head pressure<br>4. Additive pump dosage<br><br>Note: Every 2 hours
-
Wet foam density are regularly monitored and properly recorded.<br><br>Note: Every 2 hours
-
Gelling time at normal environment temperature is monitored and well-documented.
-
Machine line speed are regularly monitored and properly documented.<br><br>Note: Must be coincide with the requirements established in the process scheme.
-
Knife opening is properly set befire production and is well-documented.
-
Steam oven temperature is regularly monitored and is pripely recorded.
-
Drying oven temperature is regularly monitored and is properly recorded.
-
Foam shrinkage are regularly monitored, documented and available for the operators as reference for process control.
-
Final foam properties at the end of the line are monitored and are properly documented.<br><br>1. Thickness (every 2 hours)<br>2. Width (every 2 hours)<br>3. Length (every 2 hours)<br>4. Dry density (beginning, middle and end)
-
Foaming operators are trained to handle the line including troubleshooting production problems and handling non-conformances.
Table. 2: IGC, CoA, TDS and PS
-
Raw material article number (IGC, CoA, TDS/MSDS and PS)
-
Raw material batch number (IGC and CoA)
-
Expiry dates of raw materials (IGC)
-
Solid content of raw materials (IGC, CoA and TDS)
-
pH of all dispersions and solutions (IGC, CoA and TDS)
-
Viscosity of liquids (IGC, CoA and TDS)
-
MST of natural latex (IGC, CoA and TDS)
-
Storage and safety instructions of raw materials (TDS)
-
Cleaning instructions and materials used (TDS/MSDS and PS)
-
Compound recipe (PS)
-
Compound properties (PS)
-
Process parameters (PS)
-
Final foam properties (PS)
Transport, Storage and Handling
-
Raw materials are stored according to TDS requirement
-
Shelf life and FIFO are strictly followed
-
Treatment of non-conforming/expired materials are properly handled, well-documented and have full traceability.
-
Latex foam are stored in areas free of solvent-based materials that might contribute to increasing its VOCs or odour issues.
-
Latex foam are stored in areas where direct exposure to sunlight, heat and water are minimized.
-
Latex foam are stored and cured for 5 days
-
FIFO of latex foam products are stictly followed.
Maintenance
-
Maintenance plan for the machines and equipment are present.
-
Maintenance routines are well-documented.
-
Workers are trained to the adhere in thr maintenance plan.