Information
-
Audit Title SR Number
-
Location
-
Inspection Date:
Crew/Contractor Information
-
Select the crew/s from the drop down box. Multiple selections can be made.
- A1 Groundforce
- Allabout Excavations
- ATMS
- Citywide
- Donnaz
- Evolution Traffic
- Global Traffic
- Gramac
- IV Plumbing
- Jetstream
- JMH Excavations
- L&K Earthworks
- LMF
- Maintech
- McLean Civil
- Meiss Plumbing
- Metro Utilities Traffic
- MRB Excavations
- Other
- P&B Plumbing
- PFM M&E
- PFM SEWER
- PFM TRAFFIC
- PFM WATER
- Rangedale
- Rangedale Traffic Management (RTM)
- RBM Sewer
- Sunny Excavations
- Taylord Plumbing
- Toxfree
- The Blockage Bloke
- Underground Logistics
- 30XY
-
List the names of the crew/s
-
Are all personnel on site carrying their current CWW ID cards?
Tap to enter information
Section 1.0 HSEQ Considerations
-
1.1 Has the pre start JSEA been completed correctly with all risks identified? Has the JSEA been signed by all personnel on site? Please take a photo.
Tap to enter information
-
Please enter action
-
1.2 Have all controls identified on the JSEA been implemented appropriately?
Tap to enter information
-
Please enter action
-
1.3 Is the proper PPE being worn and in good condition? i.e. long long uniform, hard hats, safety glasses, vests, gloves, etc.
Tap to enter information
-
Please enter action
-
1.4 Is the AVDD unit being used for this task? If so, is the AVDD unit within calibration date?
Tap to enter information
-
Please enter action
-
1.5 Are the AVDD cables, earth leads and gloves in good condition? i.e. gloves not torn or have holes, cables do not have bare wires exposed or damaged insulation, earth leads dated and tagged.
Tap to enter information
-
Please enter action
-
1.6 Are the Main to Meter tickets current? Please take a photo.
-
Please enter action
-
1.7 Is there a first aid kit available and is it appropriately stocked for the activity being carried out?
Tap to enter information
-
Please enter action
-
1.8 Are all hazardous substances correctly labeled and stored correctly in spill trays?
Tap to enter information
-
Please enter actionp
-
1.9 is there a refuelling container available, is it fitted with a transfer nozzle and if a plastic fuel container, is it less than 5 years old? (date of manufacture is stamped on the bottom of plastic fuel containers)
Tap to enter information
-
Please enter action
-
1.10 Are gas offsets available? If planned or scheduled works, are DBYD plans available, including permits (if required by the DBYD plans)?
Tap to enter information
-
Please enter action
-
1.11 Is there a pipe locator available and was it used to locate services? Have all other services in the vicinity been located and marked to alleviate accidental strikes?
Tap to enter information
-
Please enter action
Section 2.0: Traffic and Pedestrian Management
-
2.1 Has the Traffic Management Risk Assessment been completed? Please take a photo.
Tap to enter information
-
Please enter action
-
2.2 Have all the listed controls that were identified in the risk assessment been appropriately implemented?
Tap to enter information
-
Please enter action
-
2.3 If the traffic management being provided by a third party, are their JSA'/SWMS and Plans completed and appropriate for the tasks being undertaken? Please take a photo.
Tap to enter information
-
Please enter action
-
2.4 Are the Traffic Qualifications held by the crew/s appropriate to the task and current, i.e. current and within the three year period? Take a photo of the ticket/s.
Tap to enter information
-
Please enter action
-
2.5 Is there appropriate Pedestrian/Traffic protection? Provide a photo of the set up.
Tap to enter information
-
Please enter action
-
2.6 Has the worksite been taped off to prevent unauthorised entry? Double taping is the minimum requirement.
Tap to enter information
-
Please enter action
-
2.7 Is there 'para webbing' available for use, if required, to prevent entry into the area?
Tap to enter information
-
Please enter action
-
2.8 Is the site housekeeping orderly with no tools, equipment or slip/trip hazards left on footpaths or public access areas?
Tap to enter information
-
Please enter action
Section 3.0: Environmental Aspects
-
3.1 Has the worksite been reinstated as per requirements and standards? i.e. clean up of driveways, gutters, nature strip, etc. Please take a photo.
Tap to enter information
-
Please enter action based
-
3.2 Aresilt traps correctly placed out to prevent excessive entry of contaminents into storm water drains?
Tap to enter information
-
Please enter action
-
3.3 Are all silt traps in good condition and able to be used? i.e not split.
Tap to enter information
-
Please enter action
Section 4.0: Customer
-
4.1 Prior to commencing the activity, have all considerations for customers been taken? i.e. blocked driveways, water off, customers notified (if required) while repairs are being taken.
Tap to enter information
-
Please enter action
-
4.2 During the task has the water main/service been kept free of contamination?
Tap to enter information
-
Please enter action
-
4.3 On completion of the task was the main, service, or hydrant flushed and or disinfected to ensure a clean supply?
Tap to enter information
-
Please enter action
-
4.4 Does the worksite require a specific clean up/disinfection due to a sewer spill etc.?
Tap to enter information
-
Please enter action
-
4.5 Has there been any damage caused to other assets or customers property?
Tap to enter information
-
Please enter action
-
4.6 If there are damages, have all the relevant details been recorded and reported? Please provide a photo of the damage and complete "Insurance report " and/or "Damage to other services report".
Tap to enter information
-
Please enter action
-
4.7 Have flanges/fittings etc. where required, e.g. planned or scheduled works, been checked for correct torque on bolts etc. with a tension wrench?
Tap to enter information
-
Please enter action
-
4.8 Has the task completion or progress been reported back to CWW? Ie. water off reported, job completed (Focus), damage, etc
Tap to enter information
-
Please enter action
Section 5.0: Vehicles Plant and Equipment
-
5.1 Are all vehicles and equipment in good working order, clean and presentable?
Tap to enter information
-
Please enter action
-
5.2 Are the correct tools/truck/crew being used for the task, i.e. no cross contamination due to a sewer spill carrying out a water task or vice versa?
Tap to enter information
-
Please enter action
-
5.3 Are vehicle and plant log books correctly filled out with any faults listed? Provide a photo of the log book/s.
Tap to enter information
-
Please enter action
-
5.4 Is there a fire extinguisher available, is it secured correctly and is it in service, i.e. been checked and tagged within the last 6 months, if the extinguisher was purchased within the last 6 months, sight the receipt of purchase.
Tap to enter information
-
Please enter action
-
5.5 Are the probes for locating services in good condition with insulated handles?
Tap to enter information
-
Please enter action
-
5.6 Is there a "sharps container and sharps grab tool" available?
Tap to enter information
-
Please enter action
Section 7.0: Asbestos tasks
-
7.1 Is there Asbestos Removals or Repairs involved in the task?
Tap to enter information
-
Please enter action
-
7.2 If Asbestos removal is required, is a copy of the contractors Asbestos Removal Licence onsite? Note: PFM Asbestos Removal licence cannot be used by a contractor or vice versa.
-
7.3 Are all personnel involved in the task appropriately trained and ticketed to carry out asbestos tasks? Asbestos removal ticket must be renewed every 24 months. Provide photo of tickets.
Tap to enter information
-
Please enter action
-
7.4 Has the Asbestos Control Plan been completed, company name specified and the supervisor nominated? Note: take specific notice of names and signatures, the nominated supervisor must be from the list of supervisors detailed on the licence. Provide photo of the Asbestos Control Plan.
Tap to enter information
-
Please enter action
-
7.5 Is the correct PPE available for use/being worn? at least P2 dust mask, coveralls, gloves, safety glasses, safety gumboots, etc.
-
7.6 Has all waste been removed as per the requirements, i.e. double bagged, SR number written on the outer bag.
Tap to enter information
-
Please enter action
Section 8.0: Excavation
-
8.1 Is the excavation over 1.5 mt. deep? If so, are the correct shoring devices being used or is the excavation "battered back", are appropriate barricades in place, is an access/egress ladders in place, has the excavation been reported to WorkSafe? NB: Notification to WorkSafe not required for emergency works.
Tap to enter information
-
Please enter action
-
8.2 Does the operator of the excavator have the appropriate licence? Who is the appointed operator? Who is acting as the Spotter and do they hold a current ESV spotter ticket?
Tap to enter information
-
Please enter action
-
8.3 Has the excavation been backfilled correctly and compacted?
Tap to enter information
-
Please enter action
Section 10.0: M&E / Sewer
-
10.1 Is the Wet Well clean and tidy as per procedures and requirements?
Tap to enter information
-
Please enter action
-
10.2 Are fall from heights barriers available and are they being used?
Tap to enter information
-
Please enter action
-
10.3 Is the area around the Well/Manhole clear of obstructions that would cause slips, trips or falls?
Tap to enter information
-
Please enter action
-
10.4 Are all Alarm Inhibit overrides been reset?
Tap to enter information
-
Please enter action
-
10.5 Are all covers correctly refitted and in proper condition?
Tap to enter information
-
Please enter action
-
10.6 Are log book details entered and station locked up?
Tap to enter information
-
Please enter action
-
10.7 Have all materials and rubbish been bagged and removed from the site, i.e. rags, old parts etc.?
Tap to enter information
-
Please enter action
Section 12.0: Opportunities for Improvement
-
Are there any Opportunities for Improvement identified in the audit?
Tap to enter information
-
Enter the details of the identified opportunities.
Section 13.0: Signatures and sign off.
-
Signature of Auditor/Supervisor/Manager
-
Signature of Additional Auditor/Supervisor/Manager