Customer Information

Customer / Client Name

Address

Customer Contact Name

Contact No.

Email

Equipment and Configuration

New Proposed Unit

Configuration

Site Information

Department / Level / Room

Rooms current use

Current system installed if any.

Available Power Supply

AERB Registration and address as per AERB registration

PNDT Certificate

Examination Room

Upload Pictures

Wall thickness and shield material Brick / Concrete or lead Partition.

Slab thickness.

Floor type Concrete / Vinyl / Tiling

Clear ht. below ceiling and beam

Room Size

Console Room

Upload Pictures

Floor type Concrete / Vinyl or Tiling

Clear ht. below ceiling and beam

Room Size

Technical Room

Upload Pictures

Floor type Concrete / Vinyl or Tiling

Clear ht. below Ceiling and beam

Room Size.

Transportation Path

Local Permission required if any?

Storage Space available or not?

Unloading feasibility - Day or Night

Wall Opening in external wall

Lift size. (1) Clear door opening (2) Lift cabin size (3) Weighing Capacity

Clear corridor size.

Temporary Platform required?

Crane required Hydra / Forklift / Telescopic

Floor Level

Standard or Nonstandard

Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.