Title Page
-
Station Name - Edited, not weighted
-
Prepared by
-
Conducted on
1.0 Site Attendance Register
-
1.1 Has the Site Attendance Register been completed for each attendance in the past 12 months?
2.0 52 Week Planner
-
2.1 Does Section 2 hold a current 52 week planner?
-
2.2 Are the PPM tasks crossed off the planner as they are completed?
-
2.3 Are the completed PPM Report Sheets filed behind the PPM Planner or under the appropriate section number where available?
3.0 M&E Reactive Worksheets
-
3.1 Does Section 3.0 hold Report Sheets relating only to M&E reactive repairs?
4.0 Fabric Reactive Worksheets
-
4.1 Does Section 4 hold Report Sheets relating only to Fabric reactive repairs?
5.0 Sub-contractor Worksheets
-
5.1 Does Section 5 hold only Sub-contractor Report Sheets?
6.0 Fire Alarm
-
6.1 Has the Fire Alarm Test Certificate been completed for each quarter covering a period of 12 months to date?
-
6.2 Are the Fire Alarm Test Certificate results duplicated in the Fire Officers Log Book?
7.0 Emergency Lighting
-
7.1 Has the Emergency Lighting Test Certificate been completed each month covering a period of 12 months to date?
8.0 Utilities Meter Log
-
8.1 Has the Utilities Meter Log sheet been updated within the past 12 months?
9.0 L8
-
9.1 Does Section 9 hold a Water Risk Assessment and Hygiene Survey Report dated within the past 24 months?
-
9.2 Does Section 9 hold a Cold Water Storage Tank Inspection Report dated within the past 12 months?
-
9.3 Does Section 9 hold Tap Temperature Readings covering a period of 12 months to date?
-
9.4 Does Section 9 hold quarterly Shower Head Clean And Descale Certificates covering a period of 12 months to date?
10.0 Pat, Microwave & RCD Testing
-
10.1 Has the Portable Appliance Test been undertaken within the past 12 months and the results recorded in Section 10?
-
10.2 Has the Microwave Emissions Test been undertaken within the past 12 months and the results recorded in Section 10?
-
10.3 Has the RCD Test been undertaken within the past 12 months and the results recorded in Section 10?
11.0 Fixed Electrical Test
-
FET Certificate held by the Property Services Department, Milford House, Swindon
12.0 Access Ramp & Wheelchair Inspections
-
12.1 Has a 6 monthly Access Ramp Inspection been undertaken and recorded in Section 12?
-
12.2 Has an Annual Wheelchair Inspection been undertaken and recorded in Section 12?
13.0 Generators
-
No generators maintained under the contract.
14.0 Auto doors
-
14.1 Has a monthly Inspection Certificate been completed for each set of auto doors?
15.0 Air Conditioning
-
15.1 Has a 6 monthly A/C Service Test Certificate been completed for each system?
-
15.2 Has a 6 monthly AHU Service Certificate been completed for each unit?
16.0 ODS Site Logs
-
16.1 Does Section 16 hold an ODS & F Gas Refrigerant Plant Log Sheet for each system holding over 3kg of refrigerant?
-
16.2 Has Section 4 (Leak Tests) of the Refrigerant Plant Log Sheet been updated within the past 12 months?
17.0 Energy Monitoring
-
17.1 Has the Energy Monitoring Sheet been updated, or PPM Report Sheets submitted for time clock alterations (Spring and Autumn)?
18.0 Gas Landlords Certificate and Boiler Servicing
-
18.1 Has a Gas Landlords Certificate been issued for each boiler within the past 12 months
-
18.2 Does Section 18 hold PPM Report Sheets for boiler services at 6 month intervals?
19.0 Risk Assessments and Method Statements
-
Maintenance contractors Risk Assessments and Method Statements held by the Property Services Department, Milford House, Swindon
20.0 COSHH
-
Maintenance contractors COSHH Certificates held by the Property Services Department, Milford House, Swindon