Title Page

CONTACT DETAILS

  • PROPERTY ADDRESS

  • SURVEY DATE

  • Customer in

  • PROPERTY TYPE

SURVEYOR DETAILS

  • SURVEYOR NAME

  • CONTACT DETAILS

PROPERTY DETAILS

  • PROPERTY IN AN EXPOSED AREA

DESIGN INFO

  • DESIGN AND FLOOR PLANS UPLOADED

  • MTRP READ AND UNDERSTOOD

  • ASBESTOS REPORT UPLOADED

  • SOLAR PV DESIGN UPLOADED

RECOMMENDED MEASURES

  • DESIGN TEAM RECOMMENDED MEASURES

  • ADDITIONAL MEASURES IDENTIFIED AT PIBI STAGE

  • Measures That Need Amended

PRODUCT SPECIFICATIONS UPLOADED

  • VENTILATION

  • SOLAR PV

  • CAVITY WALL INSULATION

  • EXTERNAL WALL INSULATION

  • LOFT INSULATION

  • HHRSH

EXTERNAL ELEVATION PHOTOS

  • ALL EXTERNAL ELEVATION PHOTOS TAKEN

EXTERNAL DEFECTS / AIR INGRESS

  • NOTES : Condition of roof , facias , soffits , etc

  • NOTES : Condition of external walls ( cracks , holes, etc )

ROOF TYPE

  • ROOF STYLE

  • ROOF TILE TYPE

  • ROOF COVERING MATERIAL

SCAFFOLD SURVEY

  • Scaffold required

  • ELEVATIONS

  • Scaffold for what measures

  • GROUND TO GUTTER HEIGHT in meters

  • GROUND CONDITION

  • EDGE PROTECTION REQUIRED

  • ACCESS ISSUES TO ERECT SCAFFOLDNG

  • ANY OBSTRUCTIONS ( CONSERVATORY , LEAN TO etc )

  • PAVEMENT PERMIT REQUIRED ( 1.5M CLEARANCE REQUIRED )

SOLAR PV ARRAY

  • INSTALLING SOLAR PV

  • NUMBER OF PANELS

  • ARRAY DESIGN

  • EXPOSED LOCATION

  • PROPOSED ELEVATION

  • SOLAR ARRAY VISABLE FROM THE ROAD

  • PLANNING PERMISSION REQUIRED

SERVICE METERS

  • ELECTRIC METER LOCATION

  • ELECTRIC METER BOX EVIDENCE

  • GAS METER LOCATION

CONSUMER UNIT

  • CONSUMER UNIT LOCATION

  • EXISTING CONSUMER UNIT SPARE WAYS ( SPD NEEDED NEEDED FOR PV )

  • RCD PROTECTED ?

  • RANGE

  • MCB TYPE

  • CONSUMER UNIT UPGRADE

  • INTERNAL DEFECTS
  • INTERNAL DEFECTS

  • ROOM

  • CONDITION OF ROOM ( damp , mould cracks in wall or ceilings etc )

REPLACE LIGHTING

  • REPLACE WITH LOW ENERGY LIGHTING

  • Bulb x

  • Batten x

  • Bulk head

DOOR UNDERCUTS

  • LOCATION OF UNDERCUTS

  • NUMBER OF UNDERCUTS

VENTILATION

  • EXISTING DMEV LOCATION

  • NEW DMEV LOCATION

  • RIGID DUCTING REQUIRED

  • LOCATION

  • LENGTH OF RIGID DUCTING IN METERS

  • Bends Required

  • EXISTING DMVHR LOCATIONS

  • NEW DMVHR LOCATIONS

WINDOW AND DOOR REPLACEMENT

  • DOORS TO BE REPLACED

  • DOOR MEASUREMENTS
  • ROOM IDENTIFIER

  • WIDTH X HEIGHT

  • REPLACE WINDOWS

  • WINDOW MEASUREMENTS
  • ROOM IDENTIFIER

  • WIDTH X HEIGHT

SOLAR INVERTER SURVEY

  • INVERTER BEING INSTALLED

  • PROPOSED INVERTER LOCATION

  • SMOKE DETECTOR REQUIRED

  • INVERTER TO ROOF DISTANCE in meters

  • INVERTER TO CONSUMER UNIT DISTANCE in meters

  • Solar Diverter Required

  • NOTES SECTION

LOFT SURVEY

  • LOFT HATCH DIMENSIONS

  • Are there any Bats / Rodents / Birds / Bees in the loft

  • ROOF PITCH IN METERS

  • CONDITION OF EXISTING ROOF FELT

  • RAFTER MOISTURE READINGS ( TAKE PHOTOS )

  • LOFT TO BE INSULATED

  • EXISTING INSULATION DEPTH

  • EXISTING INSULATION TO BE REMOVED

  • INSULATION TOTAL DEPTH REQUIRED

  • EXISTING LOFT VENTS

  • HOW MUCH BELOGINGS IN LOFT

  • CUSTOMER AWARE LOFT WILL NEED TO BE CLEARED

  • NOTES SECTION

  • STRUCTURAL SURVEY REQUIRED

  • REASON FOR STRUCTURAL SURVEY

CAVITY WALL SURVEY

  • INSTALLING CAVITY WALL INSULATION ?

  • WALL TYPE

  • CAVITY DEPTH

  • BOROSCOPE PHOTOS TAKEN ( each elevations )

  • EXTRACT AND REFILL

  • INSTALL CAVITY WALL INSULATION TO EMPTY CAVITY

  • NOTES

EXTERNAL WALL INSULATION SURVEY

  • External wall insulation

  • PROPERTY CONSTRUCTION

  • Remove existing Failed EWI

  • IS THE PROPERTY SUITABLE FOR EWI

  • ELEVATIONS REQUIRING EWI

  • EXISTING FINISH

  • IDENTIFY FRONT ELEVATION SERVICES

  • IDENTIFY REAR ELEVATION SERVICES

  • IDENTIFY LEFT SIDE ELEVATION SERVICES

  • IDENTIFY RIGHT SIDE ELEVATION SERVICES

  • ROOF OVERHANG DIMENSIONS

  • ROOF TO BE EXTENDED ?

  • CAVITY WALL PRESENT

  • DEPTH OF CAVITY

  • CONDITION OF CAVITY

  • FILL EMPTY CAVITY / EXTRACT AND REFILL

  • Boroscope photos taken ( each elevation)

  • ADDITIONAL NOTES

  • REQUIRES A STRUCTURAL ENGINEER

AIREX

  • AIREX REQUIRED

  • How many installed

  • How many required

  • HHRSH
  • INSTALLING HHRSH

  • ROOM IDENTIFIER

  • EXISTING ROOM HEATER

  • DIMENSIONS Width x Height

HOT WATER CYLINDER

  • EXISTING HOTWATER CYLINDER

  • LOCATION

  • TYPE

  • IMMERSION

  • REPLACE IMMERSION

  • REPLACE HOT WATER CYLINDER

REMEDIAL WORKS

  • ROOF TO BE REPLACED

  • NOTES

  • ADDITIONAL REMEDIAL WORKS REQUIRED

  • NOTES

ADDITIONAL NOTES REGARDING TENANT

  • undefined

Customer has been advised of

  • Our installers will need for you to provide ease of access around the external elevations , in your loft and to all the rooms in your home to allow us to install your new energy saving measures

  • all belonging in the loft to be removed prior to installing loft insulation ( for loft insulation top up works )

  • I understand that the installation works will be carried out by LivGreen in Partnership with your local Housing Association

  • Name of Customer & Signature

  • Select date

Completed PIBI and Tech Survey

  • Customer Name:

  • DATES UNAVAILABLE

  • Are you happy to proceed to the installation stage

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.