Title Page

CONTACT DETAILS

  • PROPERTY ADDRESS

  • SURVEY DATE

  • Customer in

  • PROPERTY TYPE

SURVEYOR DETAILS

  • SURVEYOR NAME

  • CONTACT DETAILS

PROPERTY DETAILS

  • PROPERTY IN AN EXPOSED AREA

  • PROPERTY IN A CONSERVATION AREA

  • PERMISSIONS APPROVED

DESIGN INFO

  • DESIGN AND FLOOR PLANS UPLOADED

  • MTRP READ AND UNDERSTOOD

  • ASBESTOS REPORT UPLOADED

  • SOLAR PV DESIGN UPLOADED

  • ASHP DESIGN UPLOADED

RECOMMENDED MEASURES

  • DESIGN TEAM RECOMMENDED MEASURES

  • ADDITIONAL MEASURES IDENTIFIED AT PIBI STAGE

  • Measures That Need Amended

PRODUCT SPECIFICATIONS UPLOADED

  • VENTILATION

  • SOLAR PV

  • AIR SOURCE HEAT PUMP

  • HHRSH

  • CAVITY WALL INSULATION

  • EXTERNAL WALL INSULATION

  • LOFT INSULATION

EXTERNAL ELEVATION PHOTOS

  • ALL EXTERNAL ELEVATION PHOTOS TAKEN

ROOF TYPE

  • ROOF STYLE

  • STRUCTURAL SURVEY REQUIRED

  • ROOF TILE TYPE

  • ROOF COVERING MATERIAL

EXTERNAL DEFECTS / AIR INGRESS

  • NOTES Condition of roof , facias , soffits , etc

  • NOTES Condition of external walls , ( identify cracks , holes , etc. )

  • STRUCTURAL SURVEY REQUIRED

  • ADDITIONAL NOTES

SCAFFOLD SURVEY

  • Scaffold required

  • ELEVATIONS

  • Scaffold for what measures

  • GROUND TO GUTTER HEIGHT in meters

  • GROUND CONDITION

  • EDGE PROTECTION REQUIRED

  • ACCESS ISSUES

  • ANY OBSTRUCTIONS ( CONSERVATORY , LEAN TO etc )

  • PAVEMENT PERMIT REQUIRED ( 1.5M CLEARANCE REQUIRED )

SERVICE METERS

  • ELECTRIC METER LOCATION

  • ELECTRIC METER BOX EVIDENCE

  • GAS METER LOCATION

CONSUMER UNIT

  • ELECTRICAL WORKS

  • CONSUMER UNIT LOCATION

  • EXISTING CONSUMER UNIT SPARE WAYS ( SPD NEEDED NEEDED FOR PV )

  • RCD PROTECTED ?

  • RANGE

  • MCB TYPE

  • CONSUMER UNIT UPGRADE

SOLAR PV ARRAY

  • INSTALLING SOLAR PV

  • NUMBER OF PANELS

  • ARRAY DESIGN

  • EXPOSED LOCATION

  • PROPOSED ELEVATION

  • SOLAR ARRAY VISABLE FROM THE ROAD

  • PLANNING PERMISSION REQUIRED

SOLAR INVERTER SURVEY

  • INVERTER BEING INSTALLED

  • PROPESED INVERTER LOCATION

  • SMOKE DETECTOR REQUIRED

  • INVERTER TO ROOF DISTANCE in meters

  • INVERTER TO CONSUMER UNIT DISTANCE in meters

  • Solar Diverter Required

  • NOTES SECTION

SOLAR BATTERY SURVEY

  • SOLAR BATTERY SPECIFIED

  • PROPOSED LOCATION

  • EXTERNAL LOCATION SUITABLE

  • 2 METER CLEARANCE FROM IGNITION SOURCE

  • 1 METER CLEARANCE FROM AN OPENING

  • 1 METER FROM BOUNDARY

  • FIRE RETARDANT SEPERATION REQUIRED

  • NOTES

  • ALTERNATIVE INTERNAL LOCATION SUITABLE

  • PROPOSED ALTERNATIVE LOCATION

  • HARD WIRED SMOKE DETECTOR REQUIRED

  • NOTES SECTION

REPLACE LIGHTING

  • REPLACE LIGHT BULBS

  • Bulb x

  • Batten x

  • Bulk head

DOOR UNDERCUTS

  • DOOR UNDERCUTS REQUIRED

  • DOOR UNDERCUTS LOCATIONS

  • NUMBER OF UNDERCUTS

VENTILATION

  • INSTALLING OR REPLACING DMEV

  • EXISTING DMEV LOCATION

  • NEW DMEV LOCATION

RIGID DUCTING

  • RIDGED DUCTING REQUIRED

  • ROOM IDENTIFIER
  • ROOM IDENTIFIER

  • LENGTH OF RIGID DUCTING IN METERS

  • Bends Required

  • INSTALLING OR REPLACING DMVHR

  • EXISTING DMVHR LOCATIONS

  • NEW DMVHR LOCATIONS

EXTERNAL DOORS AND WINDOWS

  • EXTERNAL DOORS TO BE REPLACED

  • REPLACE EXTERNAL DOOR

  • DOOR MEASUREMENTS
  • ROOM IDENTIFIER

  • Width x Height

  • WINDOW MEASUREMENTS
  • WINDOWS TO BE REPLACED

  • WINDOW MEASUREMENTS
  • ROOM IDENTIFIER

  • WIDTH X HEIGHT

LOFT SURVEY

  • LOFT HATCH TO BE REPLACED

  • HATCH DIMENSIONS IN MM

  • Are there any Bats / Rodents / Birds / Bees in the loft

  • LOFT FELT CONDITION

  • NOTES

  • ROOF PITCH IN METERS

  • EXISTING LOFT VENTS

  • RAFTER MOISTURE READINGS

  • HOW MUCH BELOGINGS IN LOFT

  • LOFT TO BE CLEARED

  • FOR WHAT MEASURES

  • LOFT TO BE INSULATED

  • EXISTING INSULATION DEPTH in mm

  • INSULATION TOTAL DEPTH REQUIRED

  • EXISTING INSULATION TO BE REMOVED

  • CUSTOMER AWARE LOFT WILL NEED TO BE CLEARED

  • NOTES SECTION

  • STRUCTURAL SURVEY REQUIRED

  • REASON FOR STRUCTURAL SURVEY

CAVITY WALL SURVEY

  • INSTALLING CAVITY WALL INSULATION ?

  • BOROSCOPE PHOTOS TAKEN ( EACH ELEVATION )

  • WALL TYPE

  • CAVITY DEPTH

  • INSTALL CAVITY WALL INSULATION TO EMPTY CAVITY

  • EXTRACT AND REFILL

  • NOTES

  • Reason for not installing CW insulation

EXTERNAL WALL INSULATION SURVEY

  • External wall insulation

  • PROPERTY CONSTRUCTION

  • EXISTING FINISH

  • ELEVATIONS REQUIRING EWI

  • IS THE PROPERTY SUITABLE FOR EWI

  • Remove existing Failed EWI ?

  • IDENTIFY FRONT ELEVATION SERVICES

  • IDENTIFY REAR ELEVATION SERVICES

  • IDENTIFY RIGHT SIDE ELEVATION SERVICES

  • IDENTIFY LEFT SIDE ELEVATION SERVICES

  • ROOF OVERHANG DIMENSIONS

  • ROOF TO BE EXTENDED ?

  • INTERNAL WALL COVERING ?

  • DOES THE PROPERTY HAVE A CAVITY

  • CONDITION OF CAVITY

  • DEPTH OF CAVITY

  • Boroscope photos taken ( each elevation)

  • FILL EMPTY CAVITY / EXTRACT AND REFILL

  • ADDITIONAL NOTES

  • REQUIRES A STRUCTURAL ENGINEER

AIREX

  • AIREX REQUIRED

  • EXISTING FLOOR VENTS

  • SINGLE BRICK AIREX REQUIRED

  • DOUBLE BRICK AIREX REQUIRED ( SLEEVE REQUIRED )

REMEDIAL WORKS

  • ROOF TO BE REPLACED

  • NOTES

  • STRUCTURAL SURVEY REQUIRED

  • INTERNAL REMEDIAL WORKS REQUIRED

  • ROOM IDENTIFIER
  • LOCATION OF REMEDIAL WORKS

  • NOTES

  • STRUCTURAL SURVEY REQUIRED

  • NOTES

HHRSH

  • INSTALLING STORAGE HEATERS ?

  • EXISTING HEATING

  • ROOM IDENTIFIER
  • ROOM IDENTIFIER

  • EXISTING HEATER TYPE

  • DIMENSIONS Width x Height in mm

HOT WATER CYLINDER REPLACEMENT ONLY

  • EXISTING HOT WATER CYLINDER

  • LOCATION

  • TYPE

  • IMMERSION

  • REPLACE IMMERSION

  • REPLACE HOT WATER CYLINDER

ASHP SURVEY ( Full Heating System )

  • HEAT PUMP SYSTEM BEING INSTALLED

  • ASHP HEAT LOSS CALCULATION UPLOADED AND COMPLETED

  • CARRY OUT ROOM BY ROOM MEASUREMENTS <br> ( Separate Form )

  • EXISTING HEATING

  • EXISTING HEATING CONTROLS

  • EXISTING EMMITTERS

  • EXISTING HOT WATER CYLINDER LOCATION

  • EXITING HOT WATER CYLINDER TYPE

  • DIMENSION OF AVAILABLE SPACE in mm ( W x D x H )

  • DOOR DIMENSIONS in mm ( W x H )

  • ALTERNATIVE LOCATION IF REQUIRED

  • VOLUMISER / BUFFER TANK PROPOSED LOCATION

  • PRESSURE RELIEF VAVE ROUTE

  • NOTES

OUTDOOR UNIT LOCATION

  • OUTDOOR UNIT BEING INSTALLED

  • SITED TO DESIGN SPECIFICATION

  • PROPOSED ALTERNATIVE LOCATION

  • 1 METER FROM THE BOUNDARY LINE

  • 2 METER CLEARANCE FROM PROPOSED PV BATTERY

  • EXISTING GROUND CONDITION

  • BASE FOR OUTDOOR UNIT

  • CONDENSE ROUTE

  • ACCESS TO SITE OUTDOOR UNIT

  • NOTES

ADDITIONAL NOTES REGARDING TENANT

  • undefined

Customer has been advised of

  • Our installers will need for you to provide ease of access around the external elevations , in your loft and to all the rooms in your home to allow us to install your new energy saving measures

  • all belonging in the loft to be removed prior to installing loft insulation ( for loft insulation top up works )

  • I understand that the installation works will be carried out by LivGreen in Partnership with your local Housing Association

  • Are you happy to proceed to the installation stage

  • REASON TENANT DOES NOT WISH TO PROCEED

  • Name of Customer & Signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.