Title Page
-
Personal Track Safety
-
Learner Name:
-
Conducted on (Date and Time)
Pre-Work Checklist
-
Wearing Full PPE? (Photograph of individual in PPE)
-
Specialist PPE required?
-
PTS Card present and in date? (Photograph of card)
-
Have they been briefed and signed the RAMS (Photograph of documents)
-
Have they been briefed by the TSC?
-
Are they fit and well and capable of carrying out the works?
Observations and Questions
-
Has the Learner signed in with the TSC (photograph of TSC book)
-
Did the learner pay attention to the TSC briefing?
-
What is the line speed?
-
Can they list the hazards of the worksite? (please list what they have identified)
-
Do they know the method of warning?
-
Do they know where the position of safety is?
-
Has the learner shown awareness of their own safety?
-
Has the learner shown awareness of RRV's?
-
Has the learner avoided walking on the sleepers?
-
Has the learner adhered to exclusion zones of RRV's or on track plant?
-
Has the learner shown good listening skills?
-
Has the learner demonstrated overall acceptable behavior whilst working on or near the line?
-
Has the learner asked any relevant questions to clarify the works being undertaken?
-
Has the learner used all tools and equipment as per method procedures?
Completion
-
Reference Guide:
• Look at the total score above and select the relevant overall rating:
Pass: 75%-100%
Further development required: >75% -
Recommendations / Overall Competency Assessment Rating
-
Supervisor (Full Name and Signature)
-
Leaner (Full Name and Signature)
Supervisor feedback and notes
-
undefined