Title Page
-
Client
- Lovell-South Thamesmead Phase II
-
Manufacturer
-
Block/Level
- A1 lv3
- A1 lv4
- A1 lv5
- A1 lv6
- A1 lv7
- A1 lv8
- A1 lv9
- A1 lv 10
- A1 lv11
- A1 lv12
- A1 lv 13
- A1 lv 14
- A1 LV 15
- A1 LV 16
- B lv1
- B lv2
- B lv3
- B lv4
- B lv5
- C lv1
- C lv2
- C lv 3
- C lv4
- C lv5
- D lv7
- D lv8
-
TudorMay Manager
-
TudorMay Subcontractor's NAME
-
Start date
-
Finish Date
-
Drawing Number-Revision used
-
Are the bottom tracks fitted correctly? Photo evidence REQUIRED
-
Are the deep tracks fitted correctly? Photo evidence REQUIRED
-
Are the studs fitted with deflection space? Photo evidence REQUIRED
-
Are the firestrips/deflection board/mastic installed(applied) correctly? Photo evidence REQUIRED
-
Are the studs spaced correctly(400mm/600mm centre)? Photo evidence REQUIRED
-
Is the metal fixing plate identified/installed correctly? Photo evidence REQUIRED
-
Are all the walls as per setting out drawings?
-
Are the Party wall junctions identified? Photo Evidence REQUIRED
-
Are the Party wall junctions with 35kg/m3 insulation identified? Photo evidence REQUIRED
-
Are the Party wall cavity filled with APR insulation? Photo evidence REQUIRED
-
Are the 90/120min FR party walls identified? Photo evidence required with the 35kg/m3 mineral insulation
-
Are the IR01/IR02/IR03 riser/smoke shaft wall type identified? Photo evidence REQUIRED
-
Are the timber studs to door jump identified? Photo evidence REQUIRED
-
Is the SECURITY MESH installed and identified? Photo evidence REQUIRED
-
Are the screws at a maximum 300mm centre? Photo evidence REQUIRED
-
Are the service fixing plasterboard strips installed at the party wall? Photo evidence REQUIRED
-
Is the screed shutter identified? Photo evidence REQUIRED
-
Evidence of British Gypsum materials used by the subcontractor(metal/board/mastic/screws) Photo Evidence REQUIRED
-
Evidence of the area being left clean after completion of works
-
TudorMay Signature
-
Client(Lovell) signature