South Thamesmead "Phase2"

  • Client

  • Tudor May Manager/Supervisor

  • Block/ Level/Flat

  • Tudor May Subcontractor name .

  • Start date

  • Finish date

Untitled Page

  • Surface is checked if its clean, dry and suitable to be skimmed?

  • Are all the plasterboard joints are scrip-taped? EVIDENCE REQUIRED

  • Are all the wall and ceiling intersections scrim-taped? EVIDENCE REQUIRED

  • Are all the corner beads fixed properly? EVIDENCE REQUIRED

  • Are all the areas skimmed properly, with no areas left exposed? EVIDENCE REQUIRED

  • Are all the corners/wall and ceiling junctions properly skimmed? EVIDENCE REQUIRED

  • Are all the electrical boxes cleaned? EVIDENCE REQUIRED

  • Are all the cables pulled out from the ceiling? EVIDENCE REQUIRED

  • Is the skirting line clean and left without any bumps? EVIDENCE REQUIRED

  • Are all the areas left clean/plaster scraped off the floor ready to be handed over?

  • Tudor may signature

  • Lovell signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.