Title Page

  • Conducted on

  • Prepared by

  • Location

Ceiling Lining

Ceiling Lining

  • Correct lining installed

  • Correct fixings are used and sufficient spacing/ centres

  • Subcontractor QA received, attached and approved

  • All lining is complete, checked and approved

Ceiling Stopping

Ceiling Stopping

  • Correct plaster product is applied

  • Stopping, slimlines and joints are square and level

  • Sufficient drying time between applications

  • Subcontractor QA received, attached and approved

  • All stopping is complete at specified finished level and approved

Postline Inspections

Council Inspection

  • Council inspection was conducted and recorded in council folder

  • Council has signed off postline inspection

Consultant Inspection

  • Consultant inspection was conducted and signed off

QA Complete

  • Postline inspection requirements complete prior to painting

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.