Title Page
-
Document No.
-
Conducted on:
-
Project:
-
Prepared by:
-
Division:
- 03-Concrete
- 04-Masonry
- 05-Metals
- 06-Wood, Plastics, and Composites
- 07-Thermal and Moisture Protection
- 08-Openings
- 09-Finishes
- 10-Specialties
- 11-Equipment
- 12-Furnishings
- 13-Special Construction
- 14-Conveying Equipment
- 21-Fire Suppression
- 22-Plumbing
- 23-Heating, Ventilating, and Air Conditioning (HVAC)
- 26-Electrical
- 27-Communications
- 31-Earthwork
- 32-Exterior Improvements
- 33-Utilities
-
Area of Work:
-
Product:
-
Other Personnel Present for Observation:
Field Observations
SMATC2P Field Observations
-
Add photo of completed SMATC2P if available
-
Substrate - Record observations in Notes, add Pictures or create Actions
-
Material Preparation - Record observations in Notes, add Pictures or create Actions
-
Application / Attachment - Record observations in Notes, add Pictures or create Actions
-
Temperature Requirements - Record observations in Notes, add Pictures or create Actions
-
Cure Period - Record observations in Notes, add Pictures or create Actions
-
Protection Methods - Record observations in Notes, add Pictures or create Actions
-
Post Install Practices - Record observations in Notes, add Pictures or create Actions
-
Other Observations
Observation Report Sign-off
-
Add signature
-
Add signature