Information
-
Project Name
-
Project No.
-
Audited by
-
Location
-
Date
-
Project Manager
-
Supervisor
1.0 Project Setup
-
1.1 Tender handover Process followed?
-
1.2 Pre-construction process followed?
-
1.3 Procurement schedule available?
-
1.4 Bonds insurance available?<br>
-
1.5 Budget agreed with area manager?
2.0 CMP / Site documentation
-
2.1 CMP available on site?
-
2.2 CMP approved / approved by AM and PM?
-
2.3 Project file structure created (1-23)?
-
2.4 Project contact details completed?
-
2.5 Hazard ID completed (HSR 01) completed?
-
2.6 HSR09 task sheets being completed?
-
2.7 HSR11 / ER04 Inductions completed?
-
2.8 Toolbox talks been recorded on HSR12?
-
2.9 EMT been completed?
-
2.10 Copies of Resource Consents on site?
-
2.11 ER08 Complaints process in place?
-
2.12 ER10 in use / completed?
-
2.13 ER11 in use / completed?
-
2.14 Enviro topics being covered on TBTs?
-
2.15 Spill response plan visible / discussed?
-
2.16 Contract specific ITP been produced?
-
2.17 HOLD POINTS agreed with the Eng?
-
2.18 CMP reviewed by CM / AM (3 monthly)?
-
2.19 NCRs raised after 'significant' rework?
3.0 Planning & Communication
-
3.1 Contract Programme available on site?
-
3.2 Progress meetings records held?
4.0 Document Control
-
4.1 Correspondence logs in place?
-
4.2 Incoming correspondence date stamped?
-
4.3 Drawing register (QF 018) in use?
-
4.4 Drawing distribution recorded? (QF016)
-
4.5 All drawings comply with register?
-
4.6 Are site diaries well completed?
5.0 Contract information
-
5.1 RFI & NTE registers in use?
-
5.2 Registers updated to reflect status?
6.0 Procurement of Materials - Goods and Services Orders
-
GSO Sample 1 Order No:
-
6.1 Supplier Name:
-
Quantity?
-
Description?
-
Unit rate?
-
Specification description?
-
Delivery arrangements?
-
6.2 Is Sample 1 GSO Value > $10k?
-
IF YES... Appropriate authority obtained?
-
IF YES... Approvals sheet raised/signed?
-
GSO Sample 2 Order No:
-
6.3 Supplier Name:
-
Quantity?
-
Description?
-
Unit rate?
-
Specification description?
-
Delivery arrangements?
-
6.4 Is Sample 1 GSO Value > $10k?
-
IF YES... Appropriate authority obtained?
-
IF YES... Approvals sheet raised/signed?
7.0 Procurement of Subcontractors (SC's)
-
Sample 1 No / Name of SC:
-
7.1 Value of SC work?
-
Form of agreement used?
-
Have SC responsibilities been defined?
-
If a SCA has been used:
-
Is SCA signed by SC prior to starting?
-
7.2 Is SC Order Sample 1 Value > $50k?
-
IF YES... Appropriate authority obtained?
-
IF YES... Approvals sheet raised/signed?
-
Sample 2 No / Name of SC:
-
7.3 Value of SC work?
-
Form of agreement used?
-
Have SC responsibilities been defined?
-
If a SCA has been used:
-
Is SCA signed by SC prior to starting?
-
7.4 Is SC Order Sample 1 Value > $50k?
-
IF YES... Appropriate authority obtained?
-
IF YES... Approvals sheet raised/signed?
8.0 Site and Data security
-
8.1 Physical site security adequate
-
8.2 Laptops / server backed up?
9.0 Internet / External audits
-
9.1 Client / Eng audits completed?
-
9.2 If YES, all required actions closed off?
10.0 Commercial Management
-
For Sample Invoices / Payment claims:
-
10.1 Invoice / Claim approved by PM?
-
10.2 Payment Schedule (PS) available?
-
10.3 PS value equals Invoice / Claim?
-
10.4 Is HEB labour being used?
-
10.5 If Yes, Timesheet processing ok?
-
10.6 Is HEB plant being used?
-
10.7 If Yes, Plant Records Process OK?
-
10.8 VOS / Verbal instructions register?
-
10.9 Quantity measurements recorded
11.0 Inspection & Testing
-
ITP Sample 1 Activity:
-
11.1 Does ITP include:
-
Specification / Testing Requirements?
-
Permitted Specification limits?
-
Inspection responsibilities?
-
Defined Verification Methods
-
Agreed 'HOLD' Points?
-
11.2 Testing records adequately completed?
-
ITP Sample 2 Activity:
-
11.3 Does ITP include:
-
Specification / Testing Requirements?
-
Permitted Specification limits?
-
Inspection responsibilities?
-
Defined Verification Methods
-
Agreed 'HOLD' Points?
-
11.4 Testing records adequately completed?
12.0 Calibration of Equipment
-
12.1 Calibration Processed being followed?
-
Health and Safety (Systems only)
-
Environmental (Systems only)
-
Quality (Systems only)
-
Auditor Name & Signature
-
Project Manager Name & Signiture
-
Next audit date