The following sets out the scoring criteria that will be used on all inspections.
-
This audit must completed by the Contractor on-boarding Manager for the first 5 jobs, and then 1 in every 5 jobs , allocated to all Contractors carrying out Electrical, Gas, Fire, or Asbestos works, on behalf of MD. It is the responsibilty of the MD on-boarding Manager to decide how long the 1 in 5 audits should continue, based on, but not limited to: scores of previous audits, frequently the Contractors are used etc.
-
Please contact the relevant member of the Compliance team for advice or support, or contact SHEQ@mdgroup.co.uk for signposting.
-
Gas Manager: Geoff.Talbot@mdgroup.co.uk
-
Asbestos Contact: Micah.Williams@mdgroup.co.uk
-
Fire Contact: Nathan.Rogers@mdgroup.co.uk
-
Electrical Contact: Nathan.Rogers@mdgroup.co.uk
-
If you have any concerns following this audit, please complete more detailed audit, i.e. QMF 262 and request a technical audit be carried out by the relevant compliance teams.
Site Inspection
-
Sub-Contractor Company name:
-
Site Operative's names:
-
Works in Progress at time of Inspection:
-
Description of works:
-
Have the Contractors verbally confirmed they are competent for the work activities being carried out?
-
Are Site Operatives following scope of works and completing works to spec?
-
Are the Contractor wearing the relevant PPE?
-
Is Housekeeping to a high standard?
Desktop Audit
-
Oneserve Job No:
-
Work type audited on site:
-
Do you have evidence that the Company are registered with NICEIC or NAPIT?
-
Upload copy
-
Electrical Contractors who are not registered with a certification body must NOT be used without permission from the Compliance Manager - Nathan Rogers
-
Have you obtained permission from the Compliance Manager to use these Contractors?
-
You must notify the Compliance Manager immediately.
-
Do you have copies of relevant individual training records for Electrical working on site, i.e. in date ECS card, NVQ, City and Guild Qualifications?
-
Upload copies
-
You must ensure competency of all electrical contractors on site and request copies of qualifications. Request copies of relevant training/qualifications - speak to your local electrical QS or email electrical@mdgroup.co.uk for guidance.
-
Do you have evidence that the Company are registered with Gas Safe?
-
Upload copy of GasSafe Certification
-
No Contactors are permitted to work with proof of in date membership to Gas Safe - notify the Gas Manager immediately. Stop any works from commencing/continuing.
-
Does the Company hold a recognised Accreditation, i.e. IFC
-
Upload a copy of Accreditation
-
Does the Company have membership to a recognised Fire Association, i.e. FPA
-
Upload copy of membership
-
Do you hold copies of relevant individual training certificates for Contractors?
-
You must notify the Head of Compliance: Nathan.Rogers@mdgroup.co.uk
-
Upload relevant copies of training/qualifications
-
What type of asbestos works are being carried out?
- Non-licensed works with Asbestos
- Licensed works with Asbestos
-
All licensed works require a formal licensed issued by the HSE - please upload a copy of the license.
-
Do you have copies of Non-licensed Asbestos Awareness training certificates for all contractors on site?
-
Upload copies of Asbestos Awareness Training certification for all contractors on site
-
Request Asbestos Awareness certificates and upload once received.
Other Comments & Signatories
-
Name:
-
Date
-