Site:
-
Job Number:
-
Conducted on
-
Conducted by
Management
-
Site Presentation adequate
-
General Housekeeping adequate
-
External signage adequate
-
Public Safety around site aqequate
-
Health & Safety policy displayed
-
HSE poster displayed
-
F10 in date
-
Health & Safety plan up to date and all appendices completed
-
Visitors and Operatives signing in
-
All on site Inducted & displaying ID badges
-
Risk Assessments relevant
-
Method Statement checked
-
COSHH Assessments relevant
-
Young Workers R/A completed
-
Statutory records up to date
-
Insurances in order MD Building Services and Sub-contractors
-
All Accidents reported to H&S Dept on same day occurred
-
Suitable First Aiders on site
-
First aid kits on site and in date
-
Tool box talk completed monthly
Scaffolding
-
Inspected weekly / HO certs
-
Ledgers/ transoms/ couplers
-
Guardrails in place (950mm/470mm)
-
Properly boarded /toe boards
-
Access location flip over barrier in place
-
Brick guards/netted satisfactory
-
Bracing/ Rakers tied back
-
Standards plumb, sole plates/base plates, free of damage
-
Access removed at end of shift
-
Tower scaffolders correctly used
-
Ladders tied off at the top on both stiles
Ladders
-
Condition / length / angle 4:1
-
Stand offs/ footed at base
-
Correct use – Risk Assessment
Working at Height
-
Suitable risk assessment conducted
-
Barriers adequate
-
Harness being worn
-
Proper access / egress
-
MEWP’s – trained personnel
Skips
-
Duty of Care Notes retained
-
Skips not overloaded
-
Removed/emptied for weekend
-
Fenced if left unattended
-
No hazardous materials in General Waste skips
-
Hazardous Waste skip locked
Traffic
-
Pedestrian routes provided and signed
-
Controlled access onto site
-
Traffic management plan in place
Welfare
-
Canteens clean
-
Drying room clean and clear
-
Hot water Washing / toilet facilities
-
Microwave / heating meals up
-
Smoking arrangements
Tenant Safety
-
If plastic sheeting is used: it must be completely cut away from all access/egress points.
Temporary sheeting should only be down whilst works are underway.
At the end of day the temporary sheeting must be removed. -
Tennant access/egress
-
Clear of hazards, i.e. safe route in/out of house. No waste left in garden or path – use bins
-
Rubbish removed
-
Carpet protection in good condition
-
Tenants health risks addressed, dust, fumes etc
-
PPE (worn)
-
PPE Register up to date
-
Safety Helmets
-
Ear protection
-
Respirator (dust mask)
-
Eye protection
-
Gloves
-
High-viz vest
-
Safety footwear
GAS (inc LPG) + HOT WORK
-
Permit to Work issued
-
Hot Works Signs on tenants doors
-
Fire Extinguishers in date and fully charged
-
Fitters Gas Safe registered
-
LPG stored in locked cage on site
-
Welding/cutting – flash back arrestor fitted
Fire
-
Site Fire Plan up to date
-
Emergency procedures displayed
-
Fire Risk Assessment completed
-
Fire alarm system available/ airhorn
-
Fire Muster point determined
-
Extinguishers in inspection date
POWER TOOLS / ELECTRICITY
-
Power tools general condition / hoses / connections / gauges
-
Battery or 110V no 230v
-
Power tools guards / deadmans switch in good order
-
Leads and extension cables
-
Distribution boards protected
-
Isolation signs on tenants panels
-
3 month PAT test
Signage
-
All signage in place
-
External site safety signage
-
Road signs suitable for operations
Health Hazards
-
Dust/Fumes
-
Noise / vibration
-
Manual Handling
-
Chemical Cleaners
-
Sharps risk identified
Asbestos
-
Surveys on site
-
Asbestos Permit in operation
-
Licensed contractors insurance checked – Mile Smith Scheme?
-
Disposal arrangements checked
Sub-Contractor Competency
-
CHAS Accredited
-
Competence Certificates in order
Working Areas
-
Site work area / access safe
-
Adequate task lighting
-
Materials and equipment safely stored and tidy appearance
-
Barriers erected to protect work area where necessary-excavations
-
Safety signage relevant to work
Sign off
-
Please add any other relevant comments:
-
Site Manager signature:
-
Date & Time