Information

Audit Process- Welding (Supply Chain).

  • Audit No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

FPC Manual and documentation control

  • Are procedures available and implemented for controlling standards and specifications?

  • Is the FPC Manual and applicable supporting documents available and understood within the organisation?

  • Are obsolete copies of controlled documents marked 'Obsolete' or removed from points of use?

  • Are forms and instructions adequately controlled?

  • Has the company documented and communicated a Quality Policy statement (iso9001 5.3)?

  • Has the company documented and communicated its Quality Objectives (iso9001 5.4.1)

  • Is there evidence that the Quality Objectives are being measured for continual improvement (9001 only) ?

  • Has the company defined it's criteria for measuring customer satisfaction (9001 only)?

  • Is there a Procedure that defines the retention of records (required by En1090) are maintained for 10 years?

  • Any other comments?

Structural Design

  • Does the company provide design services or are products made to customer drawings?

  • Does the company take the responsibility for design (structural calculations)?

  • If the company provides design services do they have a qualified Structural Engineer?

  • Are structural designs in accordance with EN1090 part 2 and EN1990 (basis for structural design)?

  • Any other comments?

Contract review (Technical Review)

  • Does the company have a formal system for reviewing incoming orders?

  • Is there a Technical Review of incoming structural orders conducted by a competent person (see ISO 3834 section 5)?

  • Does the company understand how to establish the Execution Class (Ex1, Ex2, Ex3 or Ex4) and is it recorded?

  • Are records of Technical Review maintained (re QTP checklist)?

  • Is there an effective production planning process?

  • Any other comments?

Responsible Welding Coordinator (RWC)

  • Does the company have a nominated RWC?

  • Has the RWC obtained a satisfactory level of competency?

  • Is there evidence that the RWC is competent?

  • Does the RWC have an NDT qualification?

  • Does the RWC write MWPS where required?

  • Any other comments?

Welder Qualifications

  • Does the Company have a Qualified Welding Engineer (or subcontractor)?

  • Does the Company have Certified Welders ( BS/EN 287)?

  • Do welding personnel have job knowledge training?

  • Have welding personnel been trained in the safe use of oxy /gas?

  • Are records or continual welder competency maintained ( six month prolongation)?

  • Any other comments?

Does the company have copies of controlled reference standards?

  • EN1090 parts 1 & 2 - Execution of steel structures?

  • ISO3834 parts 2 and 3 - Quality requirements for fusion welding of metallic materials?

  • ISO14731 - Welding Coordination?

  • ISO5817 : 2014 - Fusion welded joints - quality levels for imperfections?

  • BS/EN 287-1 Qualification test of welders?

  • Any other comments?

What weld inspection methods does the company conduct?

  • Are in process weld inspections conducted as defined in 1090 Part2 section 12.4.2.2?

  • Do customer specifications require NDT inspections at defined intervals?

  • Are records of NDT inspection available to satisfy 1090 or customer specific requirements?

  • Are NDT Personnel adequately qualified .i.e: Ultrasonic Inspection (UT)?

  • Any other comments?

Purchasing and materials control

  • Are purchase orders raised of components (Nuts, washers, Bolts, metal sections etc) ?

  • Do purchase orders for materials and components specify the applicable BS/EN/ISO specification?

  • Do purchase orders for Paint and Galvanising state the applicable specification?

  • Are controls in place to verify the quality of products and materials on receipt?

  • Are material and Galvanising certifications etc, checked and filed in a systematic manner?

  • Are materials and components identified and traceable to the applicable certification?

  • Are structural bolts identified and traceable to certification?

  • Is a formal system operated to control and return rejected materials?

  • Are records of supplier evaluation maintained?

  • Do supplier approval records include structural engineers, testing, plating and painting etc?

  • Any other comments?

Factory Production Control (FPC) documentation

  • Does the Organisation have a Factory Production Control (FPC) Manual?

  • Does the company use a Route Card or Shop Traveller?

  • Are weldments traceable to the applicable Qualified Welder?

  • Are welds obstructed by subsequent operations inspected prior to being covered up (e.g. witness/ inspection hold points on the works traveller)?

  • Are written welding procedures posted in close proximity to and used by the Welders

  • Are visual aids used to help standardise weld inspection?

  • Is En5817 used as a reference for imperfection standards?

  • Do employees understand and have access to welding symbols?

  • Are records of in process inspection and test recorded?

  • Is there a formal review non-conforming welds and are they recorded?

  • Is traceability maintained where appropriate?

  • Any other comments?

Welding Consumable Controls?

  • Is the Filler wire and Flux stored in a secure, clean and dry environment?,

  • Are welding filler metal traceable to a Certified Mill Test Report (CMTR)?

  • Is the welding filler wire sent to an independent UKAS Lab for Testing and verification prior to being employed?

  • Is the storage of welding consumables being controlled in accordance with good welding practice?.

  • Any other comments?

Equipment controls?

  • Are welding units subject to periodic calibration?

  • Is there a system for periodic maintainable of welding equipment?

  • Are measuring devices calibrated?

  • Does equipment control include welding gauges?

  • Does the company have a list of equipment and it's capacity, as required by ISO3834?

  • Are records of calibration and maintenance retained?

  • Any other comments?

Internal auditing (iso9001 only)

  • Does the company have a documented Internal Audit Schedule?

  • Are records of Internal Audits maintained?

  • Do Internal Audits contain adequate objective evidence?

  • Is there evidence that audit non conformances are followed up in a timely manner?

  • Any other comments?

Management review (iso9001 only)

  • Do top management hold management reviews at defined intervals?

  • Does the agenda of the Management Review satisfy ISO9001 section 5.6?

  • Are actions resulting from the management reviews implemented in an effective and timely manner?

  • Any other comments?

Control of non conforming product

  • Is a documented Non Conforming Product Procedure available?

  • Are non conforming products adequately identified and reviewed?

  • Is there evidence that non conforming products are re inspected after rework?

  • Are rework procedure available at appropriate points of use?

  • Any other comments?

Corrective Action

  • Does a Corrective Action Procedure exist?

  • Are records of corrective action maintained?

  • Are 'root causes' of non conformances identified and recorded?

  • Are corrective actions taken in a timely manner?

  • Is there evidence that corrective actions are verified before being signed off?

  • Any other comments

Preventive action (iso9001 only)

  • Does a Preventive Action Procedure exist?

  • What methods are used to identify potential non conformances (FMEA etc)?

  • Are records of preventive action maintained?

  • Are preventive actions taken in a timely manner?

  • Is there evidence that preventive actions are verified before being signed off?

  • Any other comments?

Audit summary and conclusion

  • Conclusion and summary

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.