Title Page
-
Document No.
-
Auditor
-
Sentinel Card No
-
Location
-
Conducted on
-
Contract
-
JT Number
-
SWP Number
-
Dates
-
Description of Works
Verification
-
SWP Planner
-
Date Issued
-
Person in Charge (Verification)
-
Date Verified
-
Minimum of one shift prior to start
-
Responsible Manager
-
Date Authorised
-
Person in Charge (Acceptance)
-
Date Accepted
-
Appendix A
-
Add media
SWP
-
Method of Protection
- Possession
- Line Block
- AB+Add Protection
- RETB
- Separated
- COSS+1
-
Method of Protection Correct
-
Add media
-
Hazard Directory
-
Covers Correct Mileage
-
Add media
-
Sectional Appendix
-
Worksite Covered by Sectional Appendix
-
Add media
-
Signal Diagrams
-
Correct Signal Diagrams Included
-
Add media
-
Nearest Hospital
-
Add media
-
Location Plan
-
Task Briefing Ref Number / Dates From - To
-
Add media
-
Welfare Arrangements
-
Add media
-
Permits
-
Add media
RT9909/COSS Briefing
-
Date & Time Completed
-
RT9909 Completed Correctly
-
Location
-
Add media
-
Contact the Signaller
-
Add media
-
Access Arrangements
-
Hazards
-
Add media
-
Limits of working area
-
AC or DC Lines
-
Safe system of Works
-
Add media
-
Fenced
-
Site Warden
-
Add media
-
Signature / Names
-
Add media
Line Blockages
-
Ref Number
-
Location
-
Protecting Signals
-
RT3180
-
GZAC No
-
General Arrangements
-
Will work affect the safety of the Line
-
Type of Additional Protection
- EPR
- Detonator Protection
- Signalling Disconnection
- Route Barring
- Token
- T-COD
- Lock Out Device
-
Blocking the Line
-
Granting Authority
-
Level crossing arrangements
-
Additional Protection
-
Permission to share Blockage
-
Change of COSS / PC
Planning
-
Line Blockage Request
-
SWP Register
-
10% Reviewed by Responsible Manager
-
Changes to Packs
-
SWP Issued / Authorised < A Shift
Audited By
-
Add signature