Information
-
HSQE Advisors Report
-
Document No. QTS/F/025A
-
Client / Site
-
Conducted on
-
Conducted by
-
At Risk/Reduced Risk observation undertaken?
-
Please give justification for this.
-
Location
-
Personnel
HSQE Advisors Report
-
Site location
-
Tour Date
-
Job number
-
Description of works/Subcontractor
Satisfactory
-
1. General Documentation
-
2. Site Safety
-
3. PPE Equipment
-
4. Plant Safety
-
5. Hazardous Substances
-
6. Protecting the public
-
7. Working platforms
-
8. Railway SSOW
-
9. Environment
-
10. Behaviour safety
-
11. Welfare
-
12. Quality
13. Energy
-
Vehicle/Plant on site?
-
Vehicle/Plant idling?
-
Welfare Pod in use?
-
Mains/Generators - Are these sustainable (Solar/Battery etc)
-
Are the heaters off/Windows closed when not in use?
-
Awareness, signage and communications (noticeboard).
-
14. Temporary Works
-
14.1 Has a TW Coordinator (QTS/F/411) & Temporary Works Supervisor (QTS/F/412) been appointed for the project?
-
14.2 Is there a site-specific TW Register (QTS/F/329) which identifies all applicable activities and is it being maintained?
-
14.3 Have TW Design briefs (QTS/F/423) been produced where required?
-
14.4 Is there an approved TW Design (AFC)?
-
14.5 Are the works being constructed in accordance with AFC Drawings/TW Design and specification, manufacturer’s instructions?
-
14.6 Has a handover / fitness to be taken into use certificate been issued?
-
14.7 Are permits being produced - Form E, permit to enter etc?
-
14.8 Are inspections (daily/weekly) being carried out and recorded in accordance with the legislation, regulations, specification?
-
14.9 Are there any changes to AFC’s or designs?
-
14.9.1 Are these covered and fully sanctioned by the Technical Query (TQ) process?
General Observations
-
Comments
Completed report to be forwarded to compliance department within 5 working days
-
Received by
-
Signature
-
Completed by
-
Signature