Title Page

Information

  • Auditor

  • Sentinel Card No

  • Location
  • Site

  • JT No

  • Date

  • Operation

Machine Controller/Crane Controller

  • Name

  • Sentinel Card No

  • Expiry Date

  • Photo of card

  • MC/CC Categories (required for the works)

MC Information

  • RRV Planning Sheet?

  • Lift Plan?

  • Did the MC clearly understand the information?

  • Did the MC complete the MC/CC sheets correctly?

  • Was the MC briefed by the POS Rep?

RRV Operator

  • Name

  • Sentinel No

  • Expiry Date

  • Photo of card

  • Categories (required for the works)

  • Did the operator clearly understand the briefing?

  • Did the operator complete the pre-start log?

POS Representative

  • Name

  • Sentinel No

  • Expiry Date

  • Photo of card

  • Does the POS Rep have an authority to work?

  • Is the POS Rep undertaking any other duty?

Road Rail Plant

  • Type of RRV

  • Photo of RRV

  • 12 Digit Number

  • Asset Number

  • Engineering Acceptance

  • Operators Manual

  • Service Record/Sticker

  • Pre-start Log Book

  • Duty Charts

  • Thorough Examination

  • RCI Test Certificate

Attachment

  • Type

  • Asset No

  • Operators Manual

  • Service Record/Sticker

Attachment

  • Type

  • Asset No

  • Operators Manual

  • Service Record/Sticker

Attachment

  • Type

  • Asset No

  • Operators Manual

  • Service Record/Sticker

Attachment

  • Type

  • Asset No

  • Operators Manual

  • Service Record/Sticker

Trailer

  • Type

  • 12 Digit Number

  • Asset No

  • Engineering Acceptance

  • Operators Manual

  • Service Record/Sticker

  • Brake Test Record/Sticker

Trailer

  • Type

  • Photo of Trailer

  • 12 Digit Number

  • Asset No

  • Engineering Acceptance

  • Operators Manual

  • Service Record/Sticker

  • Brake Test Record/Sticker

Lifting Accessories

  • Ref No

  • Type

  • SWL

  • Date of Thorough Examination

Lifting Accessories

  • Ref No

  • Type

  • SWL

  • Date of Thorough Examination

Lifting Accessories

  • Ref No

  • Type

  • SWL

  • Date of Thorough Examination

Lifting Accessories

  • Ref No

  • Type

  • SWL

  • Date of Thorough Examination

Safety Equipment

  • First Aid Kit

  • Fire Extinguisher

  • Spill Kit

Observations

  • On Tracking

  • Communications between MC & Operator (DECT Comm in use)

  • Lifting (working to lift plan, amendments, use of RCI)

  • Lights(machine & trailer lights, working lights)

  • General Condition

  • Stickers(EA Expiry, Data Panel, 12 Digit No, OLE Warning Line, Movement Warning Notice)

  • Brake Tests

  • General Operation

  • Off Tracking

Speed Checks

  • Time

  • Speed

Auditor

  • Auditor's Signature

I confirm the above actions have been completed

  • Name

  • Signature

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.