Title Page
Information
-
Auditor
-
Sentinel Card No
-
Location
-
Site
-
JT No
-
Date
-
Operation
Machine Controller/Crane Controller
-
Name
-
Sentinel Card No
-
Expiry Date
-
Photo of card
-
MC/CC Categories (required for the works)
MC Information
-
RRV Planning Sheet?
-
Lift Plan?
-
Did the MC clearly understand the information?
-
Did the MC complete the MC/CC sheets correctly?
-
Was the MC briefed by the POS Rep?
RRV Operator
-
Name
-
Sentinel No
-
Expiry Date
-
Photo of card
-
Categories (required for the works)
-
Did the operator clearly understand the briefing?
-
Did the operator complete the pre-start log?
POS Representative
-
Name
-
Sentinel No
-
Expiry Date
-
Photo of card
-
Does the POS Rep have an authority to work?
-
Is the POS Rep undertaking any other duty?
Road Rail Plant
-
Type of RRV
-
Photo of RRV
-
12 Digit Number
-
Asset Number
-
Engineering Acceptance
-
Operators Manual
-
Service Record/Sticker
-
Pre-start Log Book
-
Duty Charts
-
Thorough Examination
-
RCI Test Certificate
Attachment
-
Type
-
Asset No
-
Operators Manual
-
Service Record/Sticker
Attachment
-
Type
-
Asset No
-
Operators Manual
-
Service Record/Sticker
Attachment
-
Type
-
Asset No
-
Operators Manual
-
Service Record/Sticker
Attachment
-
Type
-
Asset No
-
Operators Manual
-
Service Record/Sticker
Trailer
-
Type
-
12 Digit Number
-
Asset No
-
Engineering Acceptance
-
Operators Manual
-
Service Record/Sticker
-
Brake Test Record/Sticker
Trailer
-
Type
-
Photo of Trailer
-
12 Digit Number
-
Asset No
-
Engineering Acceptance
-
Operators Manual
-
Service Record/Sticker
-
Brake Test Record/Sticker
Lifting Accessories
-
Ref No
-
Type
-
SWL
-
Date of Thorough Examination
Lifting Accessories
-
Ref No
-
Type
-
SWL
-
Date of Thorough Examination
Lifting Accessories
-
Ref No
-
Type
-
SWL
-
Date of Thorough Examination
Lifting Accessories
-
Ref No
-
Type
-
SWL
-
Date of Thorough Examination
Safety Equipment
-
First Aid Kit
-
Fire Extinguisher
-
Spill Kit
Observations
-
On Tracking
-
Communications between MC & Operator (DECT Comm in use)
-
Lifting (working to lift plan, amendments, use of RCI)
-
Lights(machine & trailer lights, working lights)
-
General Condition
-
Stickers(EA Expiry, Data Panel, 12 Digit No, OLE Warning Line, Movement Warning Notice)
-
Brake Tests
-
General Operation
-
Off Tracking
Speed Checks
-
Time
-
Speed
Auditor
-
Auditor's Signature
I confirm the above actions have been completed
-
Name
-
Signature
-
Date