Title Page
-
Project name
-
Location
-
Survey Date
-
Client
-
Principle Contractor
-
Sub-Contractor/Specialist Carrying Out Works
-
FCL Assessor/Surveyor
-
Sub-Contractor/Specialist Door Install Date And Door Reference
Summary
-
Any Issues Picked Up From Survey
No issues/defects were noted to this new door installation
-
undefined
Survey Questions
- Items to sign off
-
Location
-
Apartment Number
-
Description Of Works Completed
-
Description Of Works To Follow
-
Does the door have certification markings?
-
Are the fire door keep shut/locked labels attached?
-
Is the door gap 4mm or less, (top and sides)?
-
Does the door fit flat into its frame, without being warped?
-
Is the door free from damage?
-
Is the frame secure to the wall?
-
Seals damaged/missing/smoke seals overpainted?
-
Hinges damaged/worn?
-
Does the door engage the latch?
-
Does the door close from any angle?
-
Is the door closer functioning correctly, not slamming and closing within 5-10 seconds if fitted?
-
Hold open device working (if applicable)?
-
(If a double door) Do the doors close in line?
-
Gap under the door less than 10 mm?
-
Has this fire door passed or Failed by FCL
-
Data Sheets
-
Media
-
Tap on '+' below to add Sign Off as many as needed.
Sign Off
-
Name, Signature & Sign Date
-
Company
-
Position within company