Quality Control
-
Site conducted
-
Conducted on
-
Location
-
QES QC2_01 To QES QC2_09
-
Name of Firecrest QC Checker
-
Sheet Number: 1 of 9
-
Installtion Supervisor - Print Name - Company - Sign
-
Number Item Yes, No, First Off ITEM CHECKED of Photos I/D N/A QC Date Taken
QUALITY CONTROL CHECK SHEET
Sheet Number: 1 GROUND PREPARATION
-
Item ITEM CHECKED
-
1_1 Remediation / SI Summary available
-
1_2 Dilapidation photos taken
-
1_3 Survey of remediation area following vegetation & soil strip recorded
-
1_4 Fill materials specification acceptable
-
1_5 Fill material analysis result inclusive of sample photos
-
1_6 Fill material order details/Delivery note recorded from external supplier acceptable
-
1_7 Capping material specification recorded & acceptable
-
1_8 Capping material analysis result + Sample photos
-
1_9 Capping material order details/Delivery note recorded
-
1_10 Survey of cut and fill testing regime results acceptable
-
1_11 Cut and fill operations final level acceptable
-
1_12 Soft spots indicated if required
-
1_13 Ground cleared to agreed condition
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 2 GROUND PREPARATION
-
ITEM CHECKED
-
2_1 Grid location(s) agreed / identified
-
2_2 Excavation depth & width and surface finish acceptable to specification
-
2_3 Membrane to specification acceptable
-
2_4 Membrane Order Details / Delivery Note recorded acceptable
-
2_5 Cover requirements to specification acceptable
-
2_6 Ground cleared to agreed condition acceptable
-
2_7 Contractor verification certification recorded
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 3 GROUND PREPARATION
-
Item checked
-
3_1 Grid location(s) agreed / identified
-
3_2 Ground cleared to agreed condition
-
3_4 Geo-grid as specified in place as specified
-
3_5 Terram as specified in place as specified
-
3_6 Ground levels layered up to approved correct level
-
3_7 QC Sample test results (CBR, etc.) recorded & acceptable
-
3_8 5 Metre grid record of levelled area recorded
-
3_9 Contractor certification recorded
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 4 GROUND PREPARATION
-
Item Checked
-
4_1 Grid location(s) agreed / identified
-
4_2 Sheet piling depth confirmed & checked
-
4_3 Test results recorded
-
4_4 Site cleared to agreed condition
-
4_5 Contractor verification certificate
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 5 GROUND PREPARATION
-
Item ITEM CHECKED
-
5_1 Grid location(s) agreed / identified
-
5_2 Level survey acceptable
-
5_3 Toe excavation blinding/pitch agreed
-
5_4 Basket configuration
-
5_5 Stone specification
-
5_6 Stone specification sample approved
-
5_7 Stone Order Details/Delivery Note
-
5_8 Foundations line & level acceptable
-
5_9 Cube tests recorded if required
-
5_10 Basket finish alignment & verticality acceptable
-
5_11 Gabion anchoring system correct
-
5_12 Finish levels correct
-
5_12 Backfill stabilisation acceptable
-
5_13 Ground cleared to agreed condition
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 6 GROUND PREPARATION
-
Item Checked
-
6_1 Grid location(s) agreed / identified
-
6_2 Specification & Plan acceptable and recorded
-
6_3 Grout delivery note acceptable
-
6_4 Drilling Record recorded
-
6_5 Site cleared to agreed condition
-
6_6 Subcontractor verification certification recorded
-
Following QA checks, defect action closure & process completion sign below.
-
Sign:
-
Print:
-
Date:
Sheet Number: 7 GROUND PREPARATION
-
ITEM CHECKED
-
7_1 Specification & Plan recorded
-
7_2 Handover Certificate recorded
-
7_3 Site Cleared to agreed condition
-
7_4 Third party verification certification
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 8 GROUND PREPARATION
-
ITEM CHECKED
-
8_1 Level survey
-
8_2 Grid location(s) agreed / identified
-
8_3 Set out agreed
-
8_4 Base levels
-
8_5 Stone specification
-
8_6 Stone specification sample approved
-
8_7 Stone Order Details/Delivery Note
-
8_8 Finished levels correct
-
8_9 Base lining specification correct
-
8_10 Base lining placed acceptable
-
8_11 Surface lining specification
-
8_12 Surface lining placed
-
8_13 Subcontractor Completion certificate
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date:
Sheet Number: 9 GROUND PREPARATION
-
ITEM CHECKED
-
9_1 Party wall agreement in place
-
9_2 Work area identified
-
9_3 Set out agreed
-
9_4 Base levels
-
9_5 Existing wall survey recorded
-
9_6 Vibration monitoring record
-
9_7 Propping in place as required
-
9_8 Fixing/anchor specification
-
9_9 Fill specification
-
9_10 Fixing/Anchor Order Details/Delivery
-
9_11 Fill Details/Delivery Note
-
9_12 Party wall secured
-
9_13 Completion certificate from independent party recorded
-
FOLLOWING QA CHECKS, DEFECT ACTION CLOSURE & PROCESS COMPLETION SIGN BELOW.
-
Sign:
-
Print:
-
Date: