Title Page
-
Conducted on
-
Prepared by
-
Location
-
Contract/work and work site(s):
-
Contract No:
-
Date(s):
-
Inspected by:
Instructions: Where a non-conformance is identified, a brief explanation is to be provided in the corresponding Comments and Actions box. All non-conformances must be rectified immediately and action documented. Where an item is not applicable, the notation NA should be placed in the Comments and Actions box
-
Weather conditions (tick () appropriate boxes):
-
Fine
-
Light rain
-
Heavy rain
-
Light wind
-
Strong wind
-
Other (provide description):
General
-
Is the site in a general tidy condition?
-
Is all equipment, materials, etc contained within work area boundary?
-
Are there any obvious signs of construction-related disturbance outside of construction area(s)?
Documents
-
Has an Environmental Management Plan (EMP) been prepared for this project
-
Is the EMP readily accessible?
-
Has the EMP been read and signed by all employees?
Soil Disturbance and Erosion Control
-
Have required erosion control measures been correctly installed and are they functional?
-
Check that there are:
-
no gaps in silt fences/barriers;
-
no material lying across filter material or build up of silt; or
-
no obvious signs of significant seepage through fences
-
Are there any obvious signs of overflow from sediment detention basins?
-
Are there any obvious signs of uncontrolled drainage leaving the site?
-
Are drainage inlets protected by sediment trapping measures?
-
Are any materials, temporary structures/works in drainage lines?
-
Have works been scheduled to minimise areas exposed at any one time?
-
Are areas where construction activities have ceased being stabilised and rehabilitated?
-
Is there minimal dirt on adjacent public roads?
-
Are diversion banks and drains located appropriately?
Stockpile Management
-
Do stockpiles appear adequately maintained and managed (measures in place to prevent dust and soil run-off)?
-
Are there separate stockpiles for different material, eg weed infested soil and clean soil?
-
Are any stockpiles located within the tree drip line (3m from tree base)?
-
Are stockpiles located on the contour at least 2m from waterways, roads and slopes of greater than 10%?
-
Is the stockpile height less than 2m?
-
Is there dust control for the stockpile?
Water Quality
-
Does water quality in down slope areas appears to be unaffected by construction work?
-
Any there any apparent illegal discharges to sewers – (cleaning of paint brushes – plaster – concrete and the like)?
-
Are all hazardous materials stored in a covered area more than 20m away from drainage lines or flood prone areas?
-
Is a spill kit readily accessible?
-
Is the on-site refuelling of construction plant restricted to a designated area more than 20m away from waterways and stormwater inlets?
-
Is the wash down of construction plant/vehicles restricted to a designated area (eg truck wash out area)?
-
Are there any obvious signs of fuel spills, oil leakage, and the like from construction plant (check both plant and ground)?
-
Are the relevant Material Safety Data Sheets (MSDS) available onsite?
Noise and Vibration
-
Is the relevant plant and equipment switched off when not in use?
-
Have the local residents that are likely to be affected by offensive noise and/or vibration been notified?
-
Have local residents been notified of works to be undertaken outside of normal working hours?
-
Have the siting of work areas, vehicle and plant parking areas, material stockpiles and equipment storage has been arranged to minimise noise?
-
Are there appropriate noise and vibration controls for activities adjacent to local residents and other sensitive receivers?
Air Quality
-
Is dust suppression equipment readily accessible?
-
Are there any obvious signs of dust deposition outside of construction area(s)?
-
Is spoil being prevented from being tracked onto public roads?
-
Are the haul roads being kept damp (where required)?
-
Is there spraying for dust control?
-
Do any vehicles or plan items have visible exhaust for more than 10 seconds?
Waste Management and Minimisation
-
Do trucks removing spoil from the site have their loads covered?
-
Are contaminated land or areas fenced off?
Archaeology/Heritage
-
Have heritage protection zones been identified for this site?
-
Are all required protection measures in place and functional?
-
Are construction materials stored outside heritage protection zones?
-
Are any obvious signs of construction activity within protected areas?
-
Is any vibrating equipment being used adjacent to heritage items?
Vegetation
-
Are all required vegetation protection measures in place and functional?
-
Are any construction materials stored inside vegetation protection zones?
-
Are there any obvious signs of construction activity within protected vegetation areas?
-
Are there measures in place to minimise clearing such as protective fencing, webbing, marker tape and the like?
-
Are disturbed areas stabilised and revegetated?
-
Traffic Management
-
Have all required traffic control measures been implemented in accordance with the Project EMP (such as warning signs, temporary road closures and the like)?
-
Are all construction plant parked on site?
-
Are any private vehicles of construction personnel obstructing the passage of local traffic?
Community Consultation
-
Have local residents been notified 5 days prior to construction of activities that are likely to cause dust, offensive noise or access?
-
Are complaints being reported to the Principal’s Representative?
OTHER
-
Is the access to any private properties being obstructed?
-
Are pedestrian routes adjacent to work sites being obstructed (or are appropriate alternative routes in place)?
-
General comments about this work site(s) (including follow up action)
-
CONTRACTOR’S REPRESENTATIVE
SIGNATURE & DATE
-
PRINCIPAL’S REPRESENTATIVE