Information
-
Site Audit
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by Ry Fonseka
-
Location
-
Personnel
Health and Safety
Access and Egress
-
Site access adequate
-
Enough room to "safely work" in compound
-
Access in and out of containers adequate
-
Containers "dead zone" free of obstacles and easily accessible
-
Is a muster point available and communicated to Reilly staff
-
Is there a sign in sheet available for visitors
Welfare facilities
-
Are welfare facilities adequate and being suitably maintained by Reilly staff
-
Are vehicles in clean, tidy state
PPE
-
Are personnel wearing safety glasses, safety boots & correct clothing?
-
Are hard hats being worn when needed?
-
Hearing protection?
-
Gloves / hand protection?
-
Task specific PPE being used?
JHA / Supervisors Daily Worksheet / Permits
-
Signed by all site personnel and reviewed by the Site Supervisor for any changes?
-
In site office (or nearby)
-
Tasks being followed?
-
Are permits adequate and complete?
Personnel direction
-
Work areas defined as to stage or location
-
Crew structure identified and tasks explained
-
Photo of Previous Day Sheet
-
Photo of sign on sheet
-
Supervisor Day Sheets being used
Procedual
-
Policies adhered to and available?
-
Procedures adhered to and available?
-
JHA's adhered to and available?
Housekeeping
-
Passageways clear?
-
Slips / trips
-
Area free of spillage / clutter?
Plant and Equipment
Training
-
Are operators sufficiently trained to undertake the task?
-
Photo of a random Plant Operators Accreditation and any other Accreditations needed to undertake task they were currently working on.
Plant pre-starts
-
Have pre-starts been filled out sufficiently?
-
Photo of random pre-start
-
Is all site plant in good working order?<br>Are maintenance stickers in place and sufficient?
Guarding
-
Is all machinery guarding adequate and in place?
Excavations
Planning
-
Are 1calls on site and current?
-
Has the Supervisor reviewed the 1calls and discussed relevant services with personnel conducting the works.
-
Have we had approval to excavate from the Client (Permit to dig)?
-
Is a methodology in place and communicated to the works team.
-
Are contingencies in place should an asset be damaged?
-
Are emergency contact details available, should an asset be broken?
Pothole
-
Adequate pot holing has been done to correctly trace the existing service?
-
Personnel have clearly marked up a plan showing existing services located in the work zone.
-
PVC service markers have been installed to identify service once backfilled - showing depth to top of service, service type, type of material and size.
-
All ground markings are done with correct colours and markings. Eg, water is blue and marked with "w"
Proceed
-
Personnel fit for work
-
Plant adequate and sufficient?
Protect
-
Have all steps been taken to minimise disruption to the asset?
-
Has the asset been supported/protected during works?
Quality
Previous Corrective Actions
-
Corrective Action 1
-
Actioned closed by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 2
-
Actioned closed by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 3
-
Actioned closed by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 4
-
Actioned closed by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
Corrective Action Effectiveness (if applicable)
-
Have any previous actions being implemented?
-
Are they effective?
-
Is the hazard or risk reduced as a result of the action?
QA Documentation
-
Is QA Documentation complete to milestone achievements? Eg, Water logs, Sewer As-cons, Sewer Logs, Compaction sheets, etc.
-
Photo of a recent QA Document showing milestone achievement.
Isolation of assets
-
Positive isolation in place?
-
Procedures followed?
-
Photo of drawing showing isolations in place.
-
Add signature
Electrical tagging
-
Colour on site currently
- Red - December till February
- Green - March till May
- Blue - June till August
- Yellow - September till November
- Orange- January till June
- White - July till December
- Black - Yearly
-
Photo of item showing current colour
-
Asset # of photographed item.
Driving
-
Are seat belts being worn?
-
Driving to conditions / regulations?
-
Do personnel have the correct license?
-
Prestart check completed / vehicle or plant condition
-
Is material being transported as per Procedure?
Tools / Equipment
-
Good condition & correct use?
-
Appropriate tools for the job?
-
MSDS available / Chemicals approved?
-
Correct lifting equipment being used / current tags?
-
Correct harness / lanyard used and with current tags?
Environmental
-
Are Management Plans available and being followed?
Noise
-
Are site start times being adhered to?
-
Have any complaints or concerns by residents been raised with the Client (and the go ahead been given) before work has commenced?
Site dust control
-
Adequate dust suppression?
-
Speeds in vehicle adequate to minimise dust being created
Hazchem materials
-
MSDS sheets readily available
-
Skill kits available and adequate for site needs
-
Hazchem materials stored correctly
-
Containers labeled correctly
-
Fire extinguisher available and correct for fire fighting particular Hazchem Fire.
-
Correct waste disposal is available
Additional Comments and or immediate actions
-
Comments
Corrective Actions
-
Corrective Action 1
-
Actioned by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 2
-
Actioned by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 3
-
Actioned by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider
-
Corrective Action 4
-
Actioned by
- Ry Fonseka
- Mike Sloan
- Mike Reilly
- PM
- Supervisor
- Pipe Layer
- Machine Operator
- Offsider