Information
-
Document No.
-
Reilly Contractors
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
Documentation
-
Crew Hazard Assessment completed? Adequate hazards and controls identified? All crew members signed on?
-
Add media
-
Plant and vehicle pre start sheets being completed
-
Add media
-
Are workers signed on to site Dig Permit
-
Add media
-
Current/valid one calls (Dial Before You Dig) on site, available
-
Add media
Plant Operation
-
Plant reversing alarm working
-
Add media
-
Plant and vehicle flashing lights operational
-
Add media
-
Is plant in good working order are any defects listed on plant prestart
-
Add media
Excavation Code of Practice
-
Appropriate signs displayed i.e. construction signage, deep excavation , deep water, danger keep out
-
Add media
-
Are all Reilly installed services protected? All steel plates and lids pegged or bunted off, or riser in place, and pegged off outside of road verge and road pegs?
-
Add media
-
All existing services and assets protected? Both underground and overhead services protected, located, cable locates image on site of applicable (4 P’s method being used)
-
Add media
-
Access/egress - ramp positioned no more than every 30m along the trench and angle not exceeding 45 degrees, or steps cut into the excavation every 30m
-
Add media
-
Excavation - <br>1. All excavation 1.2m to 1.5m benched/battered<br>2. Bunting around excavations visible from a distance<br>2. Barrier around excavation work adjacent to schools and other public facilities/roads<br>3. Barrier around excavation that poses a fall hazard to workers and the public
-
Add media
-
Where batters and benches cannot meet Excavation COP, adequate shoring/boxes used?<br>Adequate access in/out and boxes?
-
Add media
-
Spoils being used as a windrow are of adequate size and protects workers from driving into excavation?
-
Add media
-
Is there delineation between pedestrian and vehicle tracks/paths and excavation?
-
Add media
-
Pedestrian and plant interface suitable? Plant vs plant/vehicle interface suitable? Enough distance allowed?
-
Add media
-
Excavated materials, plant and equipment / personnel set back >600mm from edge of excavation?
-
Add media
-
Buckets and other attachments minimum >2000mm from edge of excavation?
-
Add media
-
Works undertaken on/or adjacent to public road have valid TMP? Are sufficient colour copies of the TMP on site? Are the signs laid out as per the plan? Has the SWMS been completed and other relevant paperwork?
-
Add media
-
Slip, slop, slap mentality for summer months/warm clothing for winter months
-
Add media
-
Hard hats worn at all times
-
Add media
Corrective and preventative actions
-
Corrective / preventive actions to be completed and actioned - those with tasks aware of what is required?
-
Signature of HSE who conducted inspection and compiled report
-
Add signature