Information

  • Document No.

  • Reilly Contractors

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

General site and documentation

  • Good house keeping/general rubbish in bins provided and site rubbish disposed of (no off cuts on or in the ground)

  • Add media

  • Supervisor Day Sheet being used by all personnel DAILY?

  • Add media

  • Crew Hazard Assessment completed? Adequate hazards and controls identified? All crew members signed on?

  • Add media

  • Pre-start meeting being attended daily by all (including any subcontractors) and all signing in AND out?

  • Add media

  • Are all Reilly employees inducted into main contractor documents as well as Reilly induction paperwork?

  • Add media

  • All all sub contractors inducted into main contractor and Reilly documents?

  • Add media

  • All employees and subcontractors signed onto SWMSs prior to commencing work?

  • Add media

  • JHA and/or SWMS amended or changed to reflect the scope of works, different/new tasks which are not included in the document are assessed and managed, and all personnel re-signed on?

  • Add media

  • Required permits and licenses in place and copy on site/with each person (working near existing services, quick cut, confined space etc.)

  • Add media

  • Plant and vehicle pre start sheets being completed

  • Add media

  • Plant maintenance/next service due stickers visible?

  • Add media

  • Plant and vehicle flashing lights operational

  • Add media

  • Plant reversing alarm working

  • Add media

Emergency Management

  • All fire extinguishers inside 6 monthly test

  • Add media

  • First aid kit in Reilly site office and company cars, and fully stocked?

  • Add media

  • Qualified first aid personnel on site

  • Add media

  • HSEQ info in office with hospital map and policies etc displayed?

Excavation Code of Practice

  • Appropriate signs displayed i.e. construction signage, deep excavation , deep water, danger keep out

  • Add media

  • Are all Reilly installed services protected? All steel plates and lids pegged or bunted off, or riser in place, and pegged off outside of road verge and road pegs?

  • Add media

  • All existing services and assets protected? Both underground and overhead services protected, located, cable locates image on site of applicable (4 P’s method being used)

  • Add media

  • Current/valid one calls (Dial Before You Dig) on site, available

  • Add media

  • Access/egress - ramp positioned no more than every 30m along the trench and angle not exceeding 45 degrees, or steps cut into the excavation every 30m

  • Add media

  • Excavation - <br>1. All excavation 1.2m to 1.5m benched/battered<br>2. Bunting around excavations visible from a distance<br>2. Barrier around excavation work adjacent to schools and other public facilities/roads<br>3. Barrier around excavation that poses a fall hazard to workers and the public

  • Add media

  • Where batters and benches cannot meet Excavation COP, adequate shoring/boxes used?<br>Adequate access in/out and boxes?

  • Add media

  • Spoils being used as a windrow are of adequate size and protects workers from driving into excavation?

  • Is there delineation between pedestrian and vehicle tracks/paths and excavation?

  • Add media

  • Pedestrian and plant interface suitable? Plant vs plant/vehicle interface suitable? Enough distance allowed?

  • Add media

  • Excavated materials, plant and equipment / personnel set back >600mm from edge of excavation?

  • Add media

  • Works undertaken on/or adjacent to public road have valid TMP? Are sufficient colour copies of the TMP on site? Are the signs laid out as per the plan? Has the SWMS been completed and other relevant paperwork?

  • Add media

  • Hard temporary fencing has galv clamps, concrete feet, signage assembled and in appropriate order AND water filled barriers and cones suitable for specific road/footpath in immediate vicinity

  • Add media

  • Any risk of personnel or objects falling/collapsing? Is this managed? How?

  • Add media

  • Any risk of trip hazards to the public is managed

  • Add media

  • Confined space training completed for personnel working with fall arrest kits

  • Add media

  • Slip, slop, slap mentality for summer months/warm clothing for winter months

  • Add media

  • Hard hats worn at all times

  • Add media

  • Gloves, glasses and any other PPE being used/worn as required?

  • Add media

  • Chains and slings tagged, tag is readable, and last test is within 12 months. In good condition and fit for purpose?

  • Add media

  • Chains tagged quarterly (Dec-Feb = Red / Mar-May = Green / Jun-Aug = Blue / Sept-Nov = Yellow)

  • All electrical items tested and tagged quarterly (Dec-Feb = Red / Mar-May = Green / Jun-Aug = Blue / Sept-Nov = Yellow)

  • Add media

  • SDSs on site and readily available for all? Location of documents is known to personnel? How?

  • Add media

  • All oils and fuels bunded? Spill kit on site and accessible?

  • Add media

  • Are site sea containers tidy and organised? Trip hazards removed from the walk area and doorway? Items stored correctly on shelving etc.?

  • Add media

  • Subcontractor works - are they all safe/compliant with all aspects of their works?

  • Add media

  • Subcontractor works - are works being completed as per their SWMS and JHA?

  • Add media

Additional site specific considerations

  • ASS, dust control, noise, site specific rules or requirement: are they being complied with? Anything else to note following the inspection?

  • Add media

  • Comments - all main contractor or client specific tasks and requirements being met? Anything else?

  • Add media

Site safety file

  • Is the site safety file on site? Is it readily accessible?

  • Is the Management Plan reviewed and updated as the site works continue? Has it been communicated and acknowledged by site personnel?

  • Is the site specific risk assessment and company general risk assessment in the file? Are they communicated to site personnel?

  • If RJV is PTD complete, all signed on as required and easily accessible?

  • Does the file include training matrix, cable locates image, subby information etc

Corrective and preventative actions

  • Corrective / preventive actions to be completed and actioned - those with tasks aware of what is required?

  • Signature of HSE who conducted inspection and compiled report

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.