Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

  • Plot number

Dry lining walls

Prepare And Plan

  • Confirm Specification

  • Confirm Drawing

Pre-installation check

  • Check if all GR lines/FFL are visible and clearly marked

1st Fix - Stud and board one side

  • Check Top and Bottom track are correct and the fixings right type, installed at the correct centres, and in the correct configuration (I.e. staggered)

  • Check that the flat plate is installed where it is required.

  • Check that the vertical studs, position and fixings are correct.

  • Check baffle boxes are built in correct position and spec.

  • Check stud work is cut within the deflection head detail.

  • Check the noggins/patresses are installed for radiators etc. Note significant items may require structural engineers advice on sizing.

  • Check the door openings are to the correct width and height with timber ground inserts around door openings.

  • Check service openings formed to drawn dimensions.

  • Check the board type, thickness and number of layers.

  • Check board fixings are correct type and at correct centres in accordance with the manufacturers guidance.

Complete for Quality

  • Work area cleaned

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.