Title Page
-
Site Conducted
-
Conducted on
-
Flat/Room
-
Prepared by
Insulation
-
Check the insulation is the correct type and thickness and is fixed/suspended accordingly?
Flat plate install correctly?
-
Is flat plate installed to all areas to comply with deflection detail?
Walls
-
Check VCL is installed correctly by the manufacture's installation guidance.
-
Ensure the correct gap is left at deflection heads in line with the head detail.
-
Check board fixings are correct type and at correct centres in accordance with the manufacture installation guidance.
-
Check fire tape be applied follow British Gypsum standard
Handover
-
Are all works complete
-
Is the area clear of materials