Information
-
Property name
-
Completed by
-
Conducted on
-
Document No.
At the first stage of every inspection you must select the in built GSM tagging tool below. Click 'locate' and use the 'locate me' tab to assign the location, this will select the address you are located at. This is our electronic proof to satisfy insurers that the inspection took place at the time and date stated.
-
Location
Quarterly Premises Inspection - Quarter 3 Jul-Sept
-
User notes - All of the questions below should be answered within the 3 options provided. 'Yes' is a positive answer meaning no faults found or that all is satisfactory, 'no' means you need to add comments, and perhaps media to explain the observation, to do this press on the specific category heading to open up the comment and media box. 'N/A' is self explanatory, meaning this question does not apply to this particular site.
General Site Inspection Premises inspections should include: Housekeeping, welfare, condition of building fabrics, signage, heating / cooling, security, machinery guarding, door furniture
-
Common areas
-
Escape routes
-
Unoccupied areas
-
Plant areas
-
Roof areas
-
Car parking facilities
-
Loading bay/goods areas
-
Exterior - All building elevations checked for signs of falling debris. Note a top to bottom check will need to be assessed
Daily / Weekly Monthly Checks
-
Daily security checks
-
Weekly inspections of window cleaning cradles
-
Vacant space inspected monthly
-
Automatic extinguishant / suppression systems checked daily
-
Weekly fire alarm tests
-
Weekly emergency lighting tests
-
Weekly sprinkler flow valve tests
-
Monthly final exit door checks
-
Weekly Lift operation checks
-
Weekly lift alarm / telephone checks
-
Daily / weekly water sampling
-
Monthly temperature check (domestic systems)
Policy / Procedure
-
H&S poster displayed and complete
-
Log books in place and in use
-
Risk assessments for all onsite employee's activities in place
-
Current insurance certificate displayed
-
All first aid kits fully stocked and items in date
-
All site accidents recorded and investigated
-
Are all emergency plans and emergency contacts up to date
Contractor Audit Front of House
-
AI's issued and in date/ on site ?
-
Guards SIA licensed and badge visible
-
Guards in appropriate uniform and clean
-
Guards checked for induction of site and signed off to confirm
-
Guards workplace clean and tidy
-
Signing in book up to date
-
Key register up to date
-
Guard aware of emergency numbers including FM helpdesk
Topic Focus Water Hygiene
-
Valid risk assessment in place
-
No significant changes since last assessment
-
All daily / weekly tests giving results within accepted parameters
-
If results are unsatisfactory has immediate action been taken to resolve
-
If results are unsatisfactory have trends been examined for underlying problems
-
Are cooling towers in good visible condition
-
Are water features in good visible condition
-
Have monthly / quarterly water samples been taken and results acted upon
-
Is the management responsibilities table up to date
-
Are all training records available on site and up to date
Topic focus Asbestos
-
Has at least a type 2 asbestos survey been completed for all of the areas
-
Are the responsibilities for managing known ACMs defined
-
Is the ACM register in place and up to date
-
Are there adequate on site arrangements for communicating the asbestos register to contractors
-
Are there annual condition surveys of known ACMs taking place
-
Is there any asbestos requiring repair
Meter Readings
-
Water
-
Readings
-
Add media
-
Gas
-
Readings
-
Add media
-
Electricity
-
Add media
Track Record Notification. (Tick the relevant Section box)
-
No actions reported, to be uploaded to Track Record
-
Actions reported. To be uploaded to Track Record with associated actions.
-
Track Record login
https://knightfrank.trackrec.com/login.aspx -
Supplierweb login
https://www.supplierweb.co.uk/login.aspx
Report sign off. ( Please ensure that you have completed all questions this will be highlighted by the report score in the top right area of the report )
-
Inspection Completed By