Title Page

  • Date:

  • Inspector:

  • Location

STORMWATER POLLUTION PREVENTION PLAN

OVERALL PLANT OUTSIDE AREAS

  • All areas

  • Spilled materials

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Grassed areas

  • Bare spots or soil erosion

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Areas where spills have occurred in the past

  • Signs of spillage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Material storage areas

  • Spill potential

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Old equipment & metal recycling areas

  • Spill potential

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Shipping & Receiving areas

  • Potential contaminants

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Outfalls

  • Clear of debris, plant material, culverts

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Corroded drums or drums without plugs or covers

  • Spill potential

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Corroded or damaged tanks, tank supports, tank drain valves

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Corroded or leaking pipes

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Leaking or improperly closed valves and valve fitting

  • Spill potential

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Leaking pumps or hose connections

  • Spill potential

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Electrical Transformers

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Hydraulic Systems

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • All areas

  • Wind blown dry material

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Facility fencing, security, lighting

  • Intact and working

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • **Spill kits

  • Adequately provisioned

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

** ABOVE GROUND STORAGE TANKS

  • Containment structures

  • Signs of cracks, damage or leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Valves, fill lines, vents, connections, loading areas

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Above ground storage tanks

  • Signs of leakage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

** SHIPPING / RECEIVING AREAS

  • Shipping & receiving areas

  • Signs of spillage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Drainage facilities

  • Blockage or debris

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • Curbing or other stormwater diversion structures

  • Damage

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

ROOF AREAS

  • All plant roofs

  • Materials exhausted through vents

  • ACCEPTABLE?

  • COMMENTS/ACTIONS NEEDED

  • Responsible Person

  • Corrective Action Taken

  • Date Resolved

  • ** Also satisfies requirements for SPCC Inspections, Tests and Records

Signature Page

  • Full Name and Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.